QA/QC FOR ENVIRONMENTAL MEASUREMENT Unit 4: Module 13, Lecture 3
2
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s2 Objectives Introduce Quality Assurance Project Plans (QAPPs) What is a QAPP? Why is it necessary? Explain the processes to take when developing a QAPP Eight steps Discuss in detail elements to consider and include when developing a QAPP 24 elements
3
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s3 Quality Assurance Project Plans (QAPP) QAPP guides: the selection of parameters and procedures data management and analysis steps taken to determine the validity of specific sampling or analysis procedures The QAPP outlines the QC measures to be taken for the project. The QAPP is a project-specific QA document.
4
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s4 QA for environmental measurement Why do we need quality assurance for environmental measurement? understand data reliability quantify areas of analytical uncertainty standardize measurement to allow for repeatable and comparable data across time and place QA ensures that data will meet defined standards of quality with a standard level of confidence
5
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s5 Elements of a QAPP QAPP can be broken out into four areas of the project Project management Measurement and data acquisition Assessment and oversight Data validation and usability
6
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s6 Establishing a QAPP What do you first do when establishing a QAPP? Consider the purpose of the investigation Compliance vs. background data, etc. Consider who is funding the investigation and who will use that data What rigor is desired / monetarily feasible? Will liability be an issue? Summarize the purpose of your project
7
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s7 Steps taken to develop a QAPP Establish a QAPP team Determine project goals & objectives Collect background Determine project data requirements Develop implementation plans Develop SOPs Draft the QAPP, solicit feed back, revise and submit for approval Begin the project, evaluate and redefine QAPP
8
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s8 Steps taken to develop a QAPP Establish a QAPP team Include project stakeholders technical expertise in varying areas of the project Approval required by the governing agency? review agency website guidance document(s) http://oceanexplorer.noaa.gov/explorations/02hud son/logs/aug29/aug29.html
9
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s9 Steps taken to develop a QAPP Determine goals and objectives Why is the program being conducted? Compliance Gathering background How will the information gathered be used and who will use it? Identify all potential data users Will collected data be considered useable, and to what extent? Comparable to previous work Acceptable level of accuracy
10
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s10 Steps taken to develop a QAPP Collect background and redefine the project History of the site Sources of concern Previous investigations / collected data Site location and layout Geography and weather Watershed survey Access & safety concerns Hazards Natural Manmade http://www.tfhrc.gov/pubrds/novdec98/seven.h tm
11
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s11 Steps taken to develop a QAPP Design project sampling, analytical and data requirements What parameters will be monitored? How accurate will the data need to be? What are the Data Quality Objectives (DQOs)? Where will samples be collected and how will sites be chosen? When will sampling be implemented? What protocols will be used? How will data credibility be assured?
12
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s12 Steps taken to develop a QAPP Develop implementation plans Who will carry out the project tasks? Sampling, data management / evaluation, etc. When will the tasks be conducted? How much time will be allotted for each? Final report to be generated? http://www.ars.usda.gov/is/np/fnrb/fnrb1 001.htm
13
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s13 Steps taken to develop a QAPP Adopt or develop project-specific Standard Operating Procedures (SOPs) Use “industry” existing SOPs when possible Consistency and usability of data Reference and cite sources Provide to the field crew as a manual of instructions
14
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s14 Steps taken to develop a QAPP Draft the QAPP, solicit feedback, and submit for final approval Use formats provided by the governing agency or client Generate a draft document and solicit feed back from agency or client prior to implementation Avoids costly mistakes Provide a final revised document to appropriate project stakeholders
15
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s15 Steps taken to develop a QAPP Begin the monitoring program Implement the project as tasked and scheduled Evaluate and redefine the QAPP What does/ does not work? Revise as needed http://ma.water.usgs.gov/CapeCodToxics/photo- gallery/wq-sampling.htm
16
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s16 Outline of elements in a QAPP The four parts and the elements listed under each Project Management (elements 1-9) Measurement and Data Acquisition (elements 10 – 19) Assessment and Oversight (elements 20-21) Data Validation and Usability (elements 22-24)
17
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s17 Outline of elements in a QAPP Project Management (elements 1-9) Title and Approval Page Table of Contents Distribution List Project / Task Organization Problem Identification and Background Project/Task Description Data Quality Objectives for Measurement Data Training Requirement/ Certification Documentation and records
18
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s18 Outline of elements in a QAPP - Management Title and Approval Page (element 1) Principal investigator(s) Project QA officer(s) Client Representative Table of Contents (element 2) Distribution List (element 3)
19
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s19 Outline of elements in a QAPP – Management Project / Task Organization (element 4) Who will participate? What are their roles? Big Client, Inc. Don Realist Principal Engineer Chuck None Safety Director Sally Doright Project Engineer Discipline Lead Dave Doneall Senior Geologist Discipline Lead Mike Eager Field Technician Jane Slick Field Technician Scott Worth Project Manager & Field Supervisor Joe Systems Principal Engineer Sandy Garnet Project Director & Principal Geologist
20
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s20 Outline of elements in a QAPP - Management Problem Identification and Background (element 5) Investigation history Site specific Regional investigations Site background Setting – rural / industrial Geography and climate Regional geology, surface water and groundwater www.aquaculturecouncilwa.com/i/maps/
21
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s21 Outline of elements in a QAPP - Management Project/Task Description (element 6) What are the tasks? When will they take place? http://cs-tl1.cs.virginia.edu/~group7/schedule.php
22
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s22 Outline of elements in a QAPP- Management Data Quality Objectives (DQOs) for Measurement Data (element 7) Minimum detection limits Requirements for detection range Training Requirement/ Certification (element 8) Technical proficiency Health and safety
23
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s23 Outline of elements in a QAPP - Management Documentation and records (element 9) Field and Laboratory Raw data QC checks Field data sheets Lab forms Voucher collections
24
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s24 Outline of elements in a QAPP Measurement and Data Acquisition (Sections 10 through 19) Sampling Process Design Sampling methods requirement Sampling handling and custody requirements Analytical Methods requirement Quality Control Requirements
25
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s25 Outline of elements in a QAPP Measurement and Data Acquisition (continued Sections 10 through 19) Instrument / Equipment Testing, Inspection, and maintenance requirements Instrument Calibration and Frequency Inspection/Acceptance Requirements for Supplies Data Acquisition Requirements Data Management
26
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s26 Outline of elements in a QAPP – Data Sampling Process Design (element 10) Type Location Frequency of samples Sampling period
27
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s27 Outline of elements in a QAPP - Data Sampling methods requirement (element 11) Parameter Methods Collection Equipment Preservation Refer to SOPs
28
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s28 Outline of elements in a QAPP - Data
29
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s29 Outline of elements in a QAPP -Data Sampling handling and custody requirements (element 12)
30
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s30 Outline of elements in a QAPP - Data Analytical Methods requirement (element 13) Standardized ASTM EPA State modified Field adapted Instrument manufacture specified
31
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s31 Outline of elements in a QAPP - Data Quality Control Requirements (element 14) field blank equipment or rinsate blank duplicate/replicate samples spiked samples split and blind samples
32
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s32 Outline of elements in a QAPP - Data Instrument / equipment testing, inspection, and maintenance requirements (element 15) Include schedule Instrument calibration & frequency (element 16) Standards Frequency Inspection/acceptance requirements for supplies (element 17)
33
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s33 Outline of elements in a QAPP - Data Data Acquisition Requirements (element 18) Background information and data Previous investigations Topographic, geologic, hydrologic or hydrogeologic Other monitoring programs, groups or agencies Outside source data Specific weather conditions – barometric pressure Note any limitations/questions on data quality
34
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s34 Outline of elements in a QAPP - Data Data Management (element 19) Summarize all steps used in data collection and evaluation Completeness and accuracy Evaluation (computer hardware and softer) Minimization of errors Data entry Backup Storage http://il.water.usgs.gov/adcp/photos/class_apr99.html
35
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s35 Outline of elements in a QAPP Assessment and Oversight (elements 20-21) Assessment and Response Actions Reports Data Validation and Usability (elements 22-24) Data Review, Validation, and Verification Requirements Validation and verification of methods Reconciliation with Data Quality Objectives
36
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s36 Outline of elements in a QAPP Assessment and Response Actions (element 20) Evaluation of players - audits external programs field staff data management Correction of problems Reports (element 21) Frequency, content, distribution http://www.fe.doe.gov/techline/tl_ hydrates_oregon.shtml
37
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s37 Outline of elements in a QAPP Data Review, Validation, and Verification Requirements (element 22) Indicate what will be done and by whom Validation and verification of methods (element 23) Indicate procedures to be used Reconciliation with Data Quality Objectives (element 24) Determining if project objectives have been met
38
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s38 References Some References on Environmental Quality Assurance Plans: EPA 240/B ‑ 01 ‑ 002. EPA Requirements for Quality Management Plans (QA/R ‑ 2). March 2001. (http://www.epa.gov/quality1/qa_docs.html) EPA 240/B ‑ 01 ‑ 003. EPA Requirements for QA Project Plans (QA/R ‑ 5). March 2001. EPA 430/9 ‑ 86 ‑ 004. Quality Assurance/Quality Control (QA/QC) for 301(h) Monitoring Programs: Guidance on Field and Laboratory Methods. March 1987. (NTIS / PB87 ‑ 221164) EPA 440/4 ‑ 91 ‑ 002. Volunteer Lake Monitoring. December 1991. (http://www.epa.gov/OWOW/monitoring/volunteer/lake/in dex.html)
39
Developed by: ZwiebelUpdated: Jun. 27, 2005 U5-m13c-s39