1
Accelerated Access to BW Al Weedman Idea Integration
2
Agenda BW Overview Steps to Bring BW System Live in 30 Days Production Support Next Steps Q & A
3
Agenda BW Overview Steps to Bring BW System Live in 30 Days Production Support Next Steps Q & A
4
BW Overview Building a data warehouse will give your organization the ability to analyze information that is currently hidden within SAP R/3 (or other transactional systems).
5
BW Overview Data Provision ETL (Extraction, Transformation, Loading) Operational Data Store (ODS) Multi-dimensional data storage Metadata support Service Provider Ad-hoc querying and data distribution to downstream systems Aggregate data generation and aggregate aware reporting Warehouse Management Scheduling Data flow management Functionality Supported by Data Warehousing
6
BW Overview
7
In Order to Build an Effective Data Warehouse You Would Need: ETL Tool with SAP Extractors (Like Data Stage or Informatica) Scheduling/Monitoring Package Tool (Like Maestro) Metadata Management Tool (Like Meta Stage) DW Database Engine (Like Oracle) Robust Reporting Tool (Like Business Objects, Crystal, or Cognos) Data Modeling Tool (Like Erwin or Silverrun) Integrate all of those tools and developed pieces so that they can work together
8
BW Overview OR
9
BW Overview
10
SAP’s data warehouse solution All components of a traditional data warehouse in one package A multi-dimensional database Integrated with the mySAP suite of products Business Intelligence (BI) What is BW?
11
BW Overview Advanced functionality to manipulate data (OLAP) Quickly retrieve values using any combination of characteristics Data from R/3 and external systems can by cleansed and merged together Business Content!! Some BW Functionality
12
BW Overview Map reporting (GIS) Publish to the internet / WAP SAP Portals integration via iViews Drill through to R/3 3rd Party reporting software can be used (Business Object, Cognos, Brio, etc.) through the ODBO interface (Microsoft standard). Some BW Functionality Continued
13
Agenda BW Overview Steps to Bring BW System Live in 30 Days Production Support Next Steps Q & A
14
Steps to Bring BW Live in 30 Days! Project plan Number of stakeholders If falling behind, the decision must be made as to whether solving the individual problem is worth missing the deadline. Plan
15
Steps to Bring BW Live in 30 Days! Size the system and find a server How many users? How much data? Verson 3.0b / 3.1c runs on the 6.20 BASIS kernel. WAS built in! Operating system / Database / BW version matrix on SAP.com Install BW software Install plug-in on R/3 if needed Install patches 1 - 2 weeks Pre-Project Installation
16
Steps to Bring BW Live in 30 Days! 6.20 GUI with BW content checked Front-end patches. Now self-extracting.exe files If web front-end desired, a huge advantage is that no client based software is required Change management / training may be required depending on user base and scope of the project Roll-out GUI to the User Base throughout the Project
17
Steps to Bring BW Live in 30 Days! What information would give your project and your business the most value in the time allotted? Is there BW business content available? BW, R/3 extractors are very powerful. Use them if at all possible. User exit on the R/3 side allows non-business content data to be merged with business content. Follow good BW design practices 1 week Blueprint
18
Steps to Bring BW Live in 30 Days! Blueprint
19
Configure system-wide settings in BW (currency conversion, fiscal calendars, etc.) Configure extractor(s) in R/3 if required Develop and/or install master data in BW Develop and/or install InfoCubes, ODSes, Transfer Rules, Process Chains, etc., in BW Load test data Write queries Realization
20
Steps to Bring BW Live in 30 Days! Publish to web if in scope Develop process chains - new 3.0 functionality Security / role based Apply OSS notes as required Unit test QA - system / integration test if in scope for your project 2 weeks Realization
21
Steps to Bring BW Live in 30 Days! Initialization for deltas or full loads? The more historical data you load into BW during initialization, the longer your go-live will take. Do users need to be out of R/3 during initialization? Parallel out loads whenever possible OSS notes as required 1 week Go-live
22
Steps to Bring BW Live in 30 Days! You’re Live !!
23
Agenda BW Overview Steps to Bring BW System Live in 30 Days Production Support Next Steps Q & A
24
Production Support Think about a production support processes ahead of time If jobs are critical and are monitored 24/7, your operations department must be trained on how to use the monitor functionality in BW Otherwise custom developed processes can be used to externally monitor BW jobs If jobs are not critical, get in the habit of checking the monitor every morning
25
Agenda BW Overview Steps to Bring BW System Live in 30 Days Production Support Next Steps Q & A
26
Next Steps Add more standard business content More complex custom content Perform a requirements analysis throughout your organization for appropriate KPIs to deliver Incoming RFI requests SEM Publish queries to the internet / SAP Portals Add more robust security to existing content Merge legacy system(s) data
27
Agenda BW Overview Steps to Bring BW System Live in 30 Days Production Support Next Steps Q & A
28
Thank you for attending! Please remember to complete and return your evaluation form following this session. Session Code: 208