Download presentation
Presentation is loading. Please wait.
1
GLAST LAT Project 7/27/2004 – Lori Bator1 RFA 7 – ISOC Reports LAT status and planning Reported daily (TBR) Summary of LAT health status Limit violations Alerts received Current LAT configuration Commanding and any other special activities that occurred Mission planning outlook for near term (time period TBD) Generated by LOF with automatic and manual inputs Published to web server
2
GLAST LAT Project 7/27/2004 – Lori Bator2 RFA 7 – ISOC Reports LAT performance Reported daily (TBR) Quick look science data Performance metrics (details TBD) Generated by SOG Published to web server Level 0 data transmission report Data transmission metrics (details TBD) Automatically generated and sent to MOC following receipt of Level 0 data
3
GLAST LAT Project 7/27/2004 – Lori Bator3 RFA 7 – ISOC Reports Data Trending Housekeeping data Environmental data (temp, voltages, currents) Derived science quantities Trigger efficiency Total count rate Bright source monitoring Includes statistical analysis Generated automatically daily/weekly/monthly Published to the web
4
GLAST LAT Project 7/27/2004 – Lori Bator4 RFA 7 – ISOC Reports Data Processing Reports Produced during pipeline processing Configuration report Quality reports for digitized data Quality reports for reconstructed data Generated automatically Published to the web
5
GLAST LAT Project 7/27/2004 – Lori Bator5 Report Generation and Usage ReportFrequencySourceAuto Generation Manual Input DestinationRead By LAT Health and StatusDailyISOCYesOptionalWebHuman LAT PerformanceDaily (TBR)ISOCYesOptionalWebHuman Level 0 TransmissionLevel 0 receiptISOCYesNoMOCComputer Data TrendingLevel 0 receiptISOCYesNoWebHuman LAT Command HistoryDaily (TBR)ISOCYesNoWebHuman Data Processing Reports Level 0 receiptISOCYesNoWebHuman LAT Incident ReportsAs neededISOCNoYesMOCHuman SC Incident ReportsAs neededMOCNoYesISOCHuman As-Flown TimelineTBDMOCYesTBDISOCComputer/ Human
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.