Download presentation
Presentation is loading. Please wait.
1
1 The Medium of Wireless An in Depth Analysis of Spectrum Demand, Measurement, and Policy Department of Engineering and Public Policy (EPP) Department of Social and Decision Sciences (SDS) Heinz School of Public Policy and Management (Heinz) Carnegie Mellon University February 14 th 2002
2
2 Review Panel Public Officials Private Industry Representatives Professors
3
3 Facts and Focus “The three most important issues before the FCC today are Spectrum, Spectrum, and Spectrum” - Reed Hundt –Concentrate on broadband wireless applications –The 300MHz – 3GHz range is contentious –Cover both licensed and unlicensed use
4
4 Research Motivation Carriers are demanding more spectrum Unlicensed device sales are exploding Government agencies want to keep spectrum allocations There is known about actual spectrum utilization It is hard to shift spectrum from one service to another
5
5 Goals To provide the FCC, NTIA, and other interested organizations with constructive knowledge and insights –Address the “spectrum shortage” –Forecast future demand from emerging technologies –Measure current spectrum usage and demand –Develop and evaluate possible policy frameworks
6
6 Stakeholders Public –Consumers Private Sector –Service Providers –Equipment Manufacturers Government –FCC –NTIA –Department of Defense –Public Service Providers
7
7 Presentation Outline Introduction, Spectrum Demand –Eugene Kim Spectrum Measurement –Michelle Ng Spectrum Policy –Lynna Quandt
8
8 Demand of Spectrum Eugene Kim
9
9 Agenda How much spectrum should the FCC allocate to wireless broadband networks? –3rd Generation Licensed Wireless Networks –Unlicensed Wireless Networks spectrum policy epp project course demand group
10
10 Key Questions How much spectrum should be allocated to 3G? –Infrastructure costs are influenced by the amount of spectrum, thus influencing market penetration Is the current allocation of unlicensed spectrum appropriate? –A rising demand for unlicensed wireless devices spectrum policy epp project course demand group
11
11 Demand Projections To understand how spectrum should be allocated, we plan to understand and analyze the demand projections for: –Licensed Networks 3G –Unlicensed Networks 802.11x Bluetooth –Other Unlicensed Uses Cordless Appliances spectrum policy epp project course demand group
12
12 Supply To understand the realized demand we need to understand what services cost spectrum policy epp project course demand group 3G Wireless
13
13 Methodologies Contact cellular providers in Pennsylvania about infrastructure plans and costs –Cell density and coverage –Maximum calls per cell –Pricing plans for consumers spectrum policy epp project course demand group 3G Wireless
14
14 Supply spectrum policy epp project course demand group 3G Wireless
15
15 Demand To determine the amount of spectrum needed for the unlicensed band, two key issues need to be taken into consideration –Sales projections –Device density spectrum policy epp project course demand group Unlicensed Spectrum
16
16 Methodologies Look at current and past sales (demand) projections –802.11x chipsets –Bluetooth chipsets –Cordless Appliances Cordless Phones Baby Monitors spectrum policy epp project course demand group Unlicensed Spectrum
17
17 Methodologies Determine a model on user densities in various environments –Academic –Corporate –Public –Private spectrum policy epp project course demand group Unlicensed Spectrum
18
18 Methodologies Based on current and future figures and our density models we hope to extrapolate the necessary spectrum needed spectrum policy epp project course demand group Unlicensed Spectrum
19
19 Issues With Projections Are current projections independent of each other? –Do projections take into consideration the effect of substitute services? –Are they reasonable? Total minutes of use Cost spectrum policy epp project course demand group
20
20 Proposed Deliverables Survey of demand projections for 3G A model of how spectrum allocation affects 3G infrastructure costs Determine the amount of spectrum needed for the unlicensed band Critique projection figures and determine their credibility spectrum policy epp project course demand group
21
21 Current Usage Of Spectrum Michelle Ng
22
22 Overview Develop an empirical picture of spectrum utilization levels –Establish usage metrics for contentious licensed bands –Determine whether there is high congestion in unlicensed bands –Create a well-documented measurement methodology spectrum policy epp project course measurement group
23
23 Target Bands WRC-2000 proposed bands for 3G –698 – 960 MHz (UHF TV) –1710 – 2025 MHz (Military/NTIA) –2110 – 2200 MHz (Satellite) –2500 – 2690 MHz (MMDS) Unlicensed bands –902 – 928 MHz (ISM, Crowded) –2400 – 2484 MHz (ISM, 802.11) –5725 – 5850 MHz (UNII) –1910 – 1930 MHz (Unlicensed PCS) spectrum policy epp project course measurement group
24
24 Pittsburgh Area Representative urban environment –Pittsburgh Area Population: 2.3 Million Shadowing issues – area is hilly spectrum policy epp project course measurement group
25
25 Measurement Sites High Altitude Measurement Sites –Cathedral of Learning –Mt. Washington CMU Campus –Model for future 802.11 spectrum use Other Locations spectrum policy epp project course measurement group
26
26 Measurement Issues Time of Day –Day vs. Night Signal duration dictates scan rate –802.11 (ms) –Cellular (min) –TV (days) Targeted utilization vs. survey measurements Limited Resources spectrum policy epp project course measurement group
27
27 Example Results spectrum policy epp project course measurement group
28
28 Proposed Deliverables Analysis of frequency utilization data in the Pittsburgh area –Determine whether current license holders are utilizing their spectrum –Identify underutilized bands in which sharing could potentially be implemented –Measure traffic congestion in unlicensed bands Documented measurement methodology to facilitate future research Evaluation of previous studies and analysis of the respective results spectrum policy epp project course measurement group
29
29 Spectrum Policy Lynna Quandt
30
30 “Spectrum is the life-blood of your business. Without it, your businesses can’t grow. So my challenge is a straight forward one. We simply have to redouble our efforts to manage the spectrum resource in ways that make more spectrum available. It’s as simple as that. Spectrum scarcity is the ultimate spectrum cap.” -Frm. Chairman Kennard in his remarks to the CTIA, 2-28-00 spectrum policy epp project course policy group
31
31 Increasing Utilization Past ways the FCC has increased utilization: –Spectrum sharing –Reallocation of users –Considering secondary markets –License flexibility spectrum policy epp project course policy group
32
32 Past Policy Options Reallocation of band –FCC reallocated incumbents and re- auctioned licenses –Auction winners paid moving expenses for incumbents Adding flexibility to bands –FCC rewrote restrictions on license holders so the band could be used for additional services spectrum policy epp project course policy group
33
33 Reallocation Used to create PCS band Pros –Spectrum used for more valuable services –Auction revenue to federal budget Cons –Must agree on payment to incumbent moving expenses spectrum policy epp project course policy group
34
34 Adding Flexibility Used in 900 MHz cellular band Pros –Doesn’t require moving incumbents –Transition is faster Cons –Monetary windfall to incumbents spectrum policy epp project course policy group
35
35 A Different Approach Combination of past options Allow flexibility without the relocating incumbents Decrease windfall to incumbents for selling of flexible licenses –Similar to lottery allocation problem spectrum policy epp project course policy group
36
36 Extracting Rents for Flexibility Licensees pay for flexibility to be introduced into existing licenses –Allows for quick introduction of flexibility to bands –No reallocation of incumbents –Federal government retains some income from added services spectrum policy epp project course policy group
37
37 Issues Pricing –How to determine cost Legalities –What legal changes need to be made Implementation –Is this feasible? spectrum policy epp project course policy group
38
38 Pricing Options for implementation –FCC set price that varies by band –Market-based price for flexibility Which option is more feasible? spectrum policy epp project course policy group
39
39 Case Studies Examine band where flexibility has been introduced Possible Options –900 MHz cellular band –Creation of PCS band –MMDS band What was the market price of a license before and after flexibility was introduced? spectrum policy epp project course policy group
40
40 Legalities Is this legal under current regulation? –If not, what changes would be needed? How can the current auction system be modified to sell flexibility? spectrum policy epp project course policy group
41
41 Tasks Create case studies of past policy options Examine current auction system and propose modifications Evaluate current legal regulations and propose possible changes spectrum policy epp project course policy group
42
42 Questions for Panel How can we tailor our project to meet the needs of policy makers? Other comments and feedback
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.