Download presentation
Presentation is loading. Please wait.
1
Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery Ryan Dennison
2
Operation Introduction High volume Highly automated Thursday and Friday operation Hot dog and hamburger rolls only Raw materials to shipping dock 4500 rolls/hr 5% - 10% defect rate
3
Objectives/Scope Reduce TIMWOOD wastes Identify and Implement flow Move current state towards lean Establish metrics Research in house equipment optimization Repair/update bottleneck equipment 5S implementation
4
Issues and Risks Lack of Support from stakeholders Meet customer demands while meeting MSD requirements Line operation times Employee resistance to change Trouble supporting three different projects Limited access to the bakery
5
Plan of Attack TrackPhase 1Phase 2Phase 3Phase 4 Commercial Roll Line Shrink Reduction Identify and construct current state value stream map Focus on the process improvement of a specific target area Re-evaluate flow of rolls, create a new benchmark. Formal presentation to stakeholders Reiterate process, focusing on low cost projects to improve line performance
6
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.