Download presentation
Presentation is loading. Please wait.
1
DM - COA Housing
2
DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper
3
DM - COA with diplexer box installed Diplexer box
4
Chopper DM - FPU final configuration Alignment cubes COA Alignment devices MSA 5 MSA 1 Thermal straps For “4” and “2 K” Calibration Source IF cabling IF2 Box
5
CQM- COA Housing
6
CQM- COA Housing with dummy mirrors and alignment devices Alignment devices Alignment cubes
7
CQM- COA with Diplexer box installed Diplexer box
8
CQM- FPU with diplexer box, IF2-box and straps Alignment devices Alignment cubes IF2 Box Diplexer box Thermal straps For “4” and “2 K”
9
CQM- FPU final configuration Mirrors IF2 Box Alignment devices Alignment cubes Calibration Source Chopper Thermal straps IF cabling 12 Dummy MSA’s 2 MSA’s (band 3)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.