Download presentation
Presentation is loading. Please wait.
1
Workbench følgegruppemøde - 28.04.2010 Esben Auken GeofysikSamarbejdet, Geologisk Institut, Aarhus Universitet
2
Agenda 1. Finished and ongoing projects 2. 2 nd half year of 2010 3. Eventual 4. Next meeting
3
Support and drift l Update releases - 2 Major new developments l Maintenance releases - 5 Minor bug fixes of a character which has required an immediately fix l Support through bugreport@geo.au.dk Intension to keep a response time of less than 24 hours Fixes (always) takes longer - unfortunately - so be patient
4
Major new developments - SCI l New user interface for the SCI module - setup is made in a comprehensive wizard l A-priori information from three sources directly from the GIS by selecting a number of models attaching a grid to a layer interface attaching a seismic interface to a layer interface conductivity log attached to a number of models l A large number of optimizations in the database and inversion engine itself l Stabilizations of the inversion engine - ongoing work
5
Major new developments - DOI l Implementation of DOI calculation in the inversion kernel l DOI calculated during an LCI or SCI run
6
Major new developments - DOI l Implementation of DOI calculation in the inversion kernel l DOI calculated during an LCI or SCI run l DOI themes is created in the model visualization system DOI
7
Visualization of LCI/SCI inversions nodes l A number of new themes added - e.g DOI l Changed the internal format so themes integrates with profile sand GIS
8
Inversion kernel l Implementation of the Depth of Investigation (DOI) concept l Integration over finite gate length for TEM - will be used for all data collected after February 2010 l Response re-sampling for accurate modeling of front gate for very early gate times l Update of the documentation
9
Upcoming release l Hyper threaded batch gridding l Profiles - sections dramatically increased load speed duplicate function size and scale synchronization integration with GIS interpolation of models fading of models using DOI seismic bitmaps layer order
10
Upcoming release l SCI + LCI has new inversion kernel configuration editor l SCI has increased stability and run logs are automatically saved l Help for LCI and SCI l Scheduled for June 1 st. Developments stops at May 12 th.
11
Agenda 1. Finished and ongoing projects 2. 2 nd half year of 2010 3. Eventual 4. Next meeting
12
2 nd half year - high priority Deadline medio September 2010: l Full DOI implementation with fading of grids - requires rewriting the thematization functionality l GERDA data reporting system alternative models SCI inversions l New DBQ functionality supporting search in alternative models - requires rewriting l Creation of 3D grids for GeoScene3D
13
2 nd half year - already scheduled projects l SSV - support for grid calculations l QC of TEM, SkyTEM and PACES on the raw data level l Processing system for PACES data (major project) l New GIS component (major project) l Need some rescheduling by the steering group of GFS to accommodate the high priority projects
14
Agenda 1. Finished and ongoing projects 2. 2 nd half year of 2010 3. Eventual 4. Next meeting
15
Agenda 1. Finished and ongoing projects 2. 2 nd half year of 2010 3. Eventual 4. Next meeting
16
Next meeting l November 10th, 2010 l Minutes and ppt on the GFS homepage
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.