Download presentation
Presentation is loading. Please wait.
1
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 Summary, Conclusions and Actions Marco de Vos (devos@astron.nl)
2
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 What did we do? SPDO shared current status and baselines for the SKA Community shared science cases for AA-low and AA-mid AAVP partners shared technological developments Mutual appreciation needs to grow.
3
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 What did we learn? Much technological potential Antenna element, LNA, interconnect,... Configuration, calibration,... Potential science at the edges of the current SKA1 specs E.g. detecting the Extended Dark Ages @ 50...100 MHz System-level considerations “Be Dense” – the case for two elements The Processing Balance – maximize A/T within cost-cap Need to integrate individual reseach projects into coherent program. Key vehicle: AAVS1 -> AAVS2 -> …
4
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 What did we miss? Still an over-emphasis on receptor technology Station-level digital processing (not just BF!!!) is as important Processing requirements (HPC) as they develop over time Power is still mostly an afterthought. Antenna element, LNA, interconnect,... Configuration, calibration,... Industry involvement not addressed. Clear goals for the verification systems still missing. System design ≠ system engineering. Deep understanding versus strickt process.
5
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 What did we gain? We’ve been exercising a new interaction model SPDO <> AAVP Preparing for the PEP phase (2013-2016) “Gently bringing the news that the SKA is becoming an engineering project very quickly.” “It’s about the system, not the elements” “It would be great if we could build a coherent project” “People start to realise that they need to start writing things up”
6
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 What should we do? Turn AAVP into a coherent program[AAVP MT] Further detailing of AAVS1, AAVS2 could facilitate this Maintain focus on SKA1+AIP/SKA2, full system Analyse the impact of some science proposals[Community] Detection of Extended DA @ 50...100MHz in SKA1 ?? HI & pulsars with 2015 AIP AA-mid array if 1500m 2 ?? Engage AAVP and PathFinders in system baseline[SPDO] System requirements spec, top level SKA system design Together seek the clever tricks to keep SKA within cost cap. Analyse several AA-system level trade-offs[AAVP] Continuous beam-shape cal. versus element calibration # elements, station size, station layout,... Processing power SKA1 AA-low and AIP AA-mid
7
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 What should we do? Write things up in reviewable documents[AAVP, SPDO] Read each other’s documents[all] Prepare for PreConstruction Phase [AAVP SC] AA subsystem (PEP-WP6) Workpackage Consortium
8
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 “We seem to have a plan..." Optimise for imaging EoR @ 140MHz Optimise for pulsars and HI @ 400MHz
9
Marco de Vos Summary, Conclusions & ActionsAAVP 2010 Thanks! LOC: Andrew Faulkner (chair) Paul Alexander Karen Scrivener Nima Razavi-Ghods Eloy de Lera Acedo SOC: Paul Alexander Arnold van Ardenne Peter Hall Andrew Faulkner Chris Carilli Lincoln Greenhill Luigina Feretti Ger de Bruyn Dave Deboer Michael Jones Joe Lazio Kobus Cloete