NCDA: Pickle Sorter Project Proposal Project 98.09 Sponsored by Ed Kee of Keeman Produce, Lincoln, DE
2
2 Overview Introduction –Description of Problem Method –Wants Metrics Concepts –System and Functional Benchmarking Schedule –Division of labor –Budget
3
3 Project Background Title: Pickle Sorter Sponsor: Ed Kee of Keeman Produce Problem: The pickling cucumber industry currently separates undesirable cucumbers from desirable ones manually. Mr. Kee would like a device to efficiently and reliably separate the usable cucumbers from the unusable ones.
4
Schematic
5
5 Strategy Mission: To provide an integrated, automated system to sort out undesirable pickles on the processing line. Approach: Collect customer wants and develop them into metrics which can be used to evaluate benchmarks and concepts for a design solution.
6
6 Customers and Wants
7
7 Benchmarking Current Method: –Manual selection and removal - No integrated, efficient, inexpensive system currently in use. System: –Several integrated solutions exist, each having its own set of problems. Functional: –Many of our concepts include functions that have been independently developed for other.
8
8 Wants Metrics Cost –Price Effectiveness –% Good Removed –% Bad Removed Working Area –Length –Width Reliability –Mean Time to Failure Speed –Pickles Per Minute Portability –Size –Weight
9
9 Target Values
10
10 System Benchmarks
11
11 Functional Benchmarks
12
12 Concept Generation Concepts –Brainstorming Identification: –Imaging –Mechanical Removal: –Pneumatic –Mechanical –Benchmarking Systems: –Bacchus –Aweta Functional: –Ensco –SensoRx –ELOP –Staalkat B.V.
13
13 Concepts 1Imaging system coupled to solenoid activated pneumatic piston. 2Imaging system with a trap door removal system. 3Imaging system which controls a robotic removal arm. 4Tilted conveyor belt which separates good and bad pickles based on rolling characteristics.
14
14 Concept Evaluation 1- Imaging/Pneumatic System: Most Promising; Is equally good with Effectiveness and Speed. Cost currently unknown. 2- Imaging/Trap Door System: Similar to system above, lags behind in Effectiveness and Speed. 3- Imaging/Robotic Arm System: Cost prohibitive if Speed Target Value is to be met. Also, more moving parts may decrease Reliability. 4- Rolling Method: Fails Effectiveness, Speed Metrics; Has been ruled out.
15
15 Division of Work
16
Progress To Date:
17
Schedule To Next Presentation:
18
18 Estimated Budget
19
19 Closing Points Metrics Derived From Wants Benchmarks Evaluated Using Metrics Initial Concepts Evaluated Using Metrics Progress and Looking Ahead