Presentation is loading. Please wait.

Presentation is loading. Please wait.

Faculty Assembly Report Information Resources November 2010.

Similar presentations


Presentation on theme: "Faculty Assembly Report Information Resources November 2010."— Presentation transcript:

1 Faculty Assembly Report Information Resources November 2010

2 Completed Projects New e-mail system for faculty and staff –Business Productivity Online Suite Microsoft Exchange for e-mail and calendar 25 GB mailbox Microsoft SharePoint for document sharing and collaboration Microsoft Office Communications Server for presence (status of person’s current availability), instant messaging, voice, video and collaboration Integration with UND’s current voice system to provide limited voice features (i.e., access to voice messages through e-mail client)

3 Safe Connect –Secure connection to wired and wireless network Bomgar –Remote access control for desktop support Dell Support –Continued to be a certified Dell support shop Completed Projects

4 New Videoconference classroom (Rm 5121) Mediasite Lecture Capture –United, Haugen, Keller & Rm 5520 –Tied into Active Directory for single sign-on for students –Mobile Access 18 new 58’’ Plasma TVs in PCL rooms Active Directory in PCL rooms and B320B Completed Projects

5 Helped with UND Simulation Center –B-Line Medical –Signature AV

6 Completed Projects 3001 Remodeling

7 Completed Projects Grand Forks –B320B Computer Lab upgrade New videoconferencing Smart classroom –OT Classroom –United, Haugen, & Keller lecture rooms upgrade Crestron Control Systems New Cameras 32x32 Video Matrix switch in Keller Integrated Videoconferencing units Improved audio

8 Completed Projects Grand Forks –New on-premise MS Sharepoint server 2010 –Sharepoint training for staff –New CME database –CRM Training for staff Fargo –Lab upgrade Bismarck & Minot –Servers upgrades

9 Completed Projects New Microsoft Deployment server –Rapid deployment for new computers –Faster upgrade for old computers New File Storage Server for researchers –16 Terabyte –Expandable –Redundancy & Daily Backup Gigabyte access to research area –Internet-2 connection

10 Completed Projects Information Resources restructure –Computer Services  Information Technology Services (led by Vicki Link) –Videoconferencing Services New Centralized Conferencing Scheduler Medical Media –Free Graphic Design Services

11 Future Projects Rm 5006 Remodel New Website –UND Templates –Omni Update SMHS Image Library –Sharepoint 2010


Download ppt "Faculty Assembly Report Information Resources November 2010."

Similar presentations


Ads by Google