27.5.04TRD Status meeting GSIClemens Adler Chamber production Production status/ Material status
2
27.5.04TRD Status meeting GSIClemens Adler Production Status George and Petre from Bukarest were at Hd for 3 weeks: –We built 2 complete chambers + Glued 3 Frames + half wired 2 chambers Problems encountered: –Everything, especially: –Wire Winding –Padplane gluing
3
27.5.04TRD Status meeting GSIClemens Adler Problems (new): Winding Winding machine: –Frame vibration: Cathode: wire jumps off Meteor Anode: wire breaks Currently: Brake on wire roll+slow velocity works. Control Problem: –At end of winding, winding machine does not stop. (happend twice) ->under investigation
4
27.5.04TRD Status meeting GSIClemens Adler Problems (cont.): Padplanes gluing Scheme so far: –Roll on glue onto Fischer Panel Problem: always unglued areas. Same Problem reported by Oleg
5
27.5.04TRD Status meeting GSIClemens Adler Padplane glueing (cont.) Different approach: Result: very flat and glued everywhere. +less glue needed
6
27.5.04TRD Status meeting GSIClemens Adler Padplane gluing (even more) Back Panels display a warping after gluing the Padplanes: measured on padplane side: up to 600 microns lower in the middle than at the edges This behaviour is observed on 3 different Panels. But: gain uniformity is OK. Maybe no Problem, but watch it.
7
27.5.04TRD Status meeting GSIClemens Adler (old) Production problems L-profiles are bent more than expected -need additional clamps on gluing table. After gluing to Radiator: L6C1 Chamber: <0.2 mm flatness: -> seems to be no Problem, when care is taken during gluing process (use additional clamps on gluing table). Profile Production: L-profiles: keep inhouse Front profiles: Investigate outside company
8
27.5.04TRD Status meeting GSIClemens Adler Wiretension machine Prototype at Hd, working, but still some minor glitches to work out.
9
27.5.04TRD Status meeting GSIClemens Adler Production To Do Last meeting: Second Video measureing table need rails and camera holder. Produce wire ledge gluing tool H.Daues‘ design for TPC Design distance ledge gluing tool Current status: Standalone camera holder, new lens needed Not done Done for L1/2C0 types
10
27.5.04TRD Status meeting GSIClemens Adler Production Sites Dubna: 2nd transport is almost prepared (some Padplane problems induced a slight delay) -> Material for 12 L1C0, L2C0 Chambers Bukarest: 1st material transport underway. Mihai &Co. is heavily preparing tooling (Glass tables, Lifting device for wire frames, X-Y table for X-ray source etc).
11
27.5.04TRD Status meeting GSIClemens Adler Material Status L2C0 Padplanes: –significant amount of broken traces (~50% of PP of type 1) –still lots of shorts on padside L6C1 Padplanes: –arrived last week –middle piece is not machined to specs (>20% of PP unacceptable) L1C1 Padplanes: –arrived last week –middle pieces fit very nicely Optiprint visit in 1 week to discuss quality issues L-Profiles: 24 x C0 shipped to Dubna, 8 x C0 to Bukarest (~37 x L5/6C1 ready) next type: L1C1 Front Profiles: 18xL1, 16xL2 to Dubna 4xL1, 4xL2 to Bukarest L1 in production (16 x L6 ready)
12
27.5.04TRD Status meeting GSIClemens Adler Material in Graphs L-Profiles: Front-Profiles: Status 25.5.04
13
27.5.04TRD Status meeting GSIClemens Adler More issues Padplane test system will be moved to Frankfurt next week Chamber test setup near final –Rainer will prepare test document