DØ Collaboration Meeting October 10, 2003 1 DØ RunIIb Trigger Upgrade Vivian O’Dell, FNAL for the DØ Trigger Upgrade Group
2
DØ Collaboration Meeting October 10, 2003 2 Run IIb Trigger Upgrades Strategy and Motivation u Latest Luminosity Predictions u Basic trigger upgrade strategy Technical progress Installation/Commissioning plans Summary
3
DØ Collaboration Meeting October 10, 2003 3 Run IIb Luminosity Projections ~1.6e32 ~2.8e32 Accelerator draft plan: Peak luminosities Peak Luminosity (x10 30 cm -2 sec -1 ) You are here Peak FY03 ~4.5e31
4
DØ Collaboration Meeting October 10, 2003 4 Core Trigger Menu Simulations Total L1 bandwidth budget= ~3 kHz Total rate: ~15kHz ~30kHz ~3.2kHz Additional headroom available from topological cuts available in upgraded L1cal Higher mu p T threshold with upgraded CTT 1E32 2E32 2E32
5
DØ Collaboration Meeting October 10, 2003 5 Ingredients of the Trigger Upgrade Level 1 u Calorimeter trigger upgrade s sharpens turn-on trigger thresholds s more topological cuts u Calorimeter track-match s fake EM rejection s tau trigger u L1 Tracking trigger upgrade s improved tracking rejection esp. at higher occupancies s inputs to Calorimeter track-mathc Level 2 u L2 Processor upgrades for more complex algorithms u Silicon Track Trigger expansion s More processing power s use trigger inputs from new silicon layer 0 Upgrade/maintain DAQ/Online systems
6
DØ Collaboration Meeting October 10, 2003 6 The L1Cal Team SaclayADFs/ADF Timing/Splitters u Physicists: J.Bystricky, P.LeDu*, E.Perez u Engineers:D.Calvet, Saclay Staff Columbia/NevisTABs/GABs/VME-SCL u Physicists:H.Evans*, J.Parsons, J.Mitrevski u Engineers:J.Ban, B.Sippach, Nevis Staff Michigan StateFramework/Online Software u Physicists:M.Abolins* u Engineers:D.Edmunds, P.Laurens NortheasternOnline Software u Physicists:D.Wood FermilabTest Waveform Generator u Engineers:G.Cancelo, V.Pavlicek, S.Rapisarda * L1Cal Project Leaders
7
DØ Collaboration Meeting October 10, 2003 7 Run IIa Limitations Poor Et-res. (Jet,EM,MEt) u slow turn-on curves s 5 Gev TT thresh 80% eff. for 40 GeV jets u low thresholds unacceptable rates at L = 2 10 32 2.1 (L = 2e32) ZH vvbbJet Trigger 2 TT>5 GeV + MEt>10 GeV 1.3W evEM Trigger 1 TT>10 GeV Rate (kHz)Phys. ChanTrigger L1 Rate Limit <5 kHz
8
DØ Collaboration Meeting October 10, 2003 8 Run IIb Solutions (2) Solution for Rates: Sliding Windows Algorithm u Et cluster local max. search on 40 32 ( ) TT grid u Jet, EM & Tau algo’s u Better calc of missing Et u Topological Triggers u Jet, EM clust output for matching with L1 Tracks Benefits u 2.5–3 Jet Rate reduction at constant efficiency s ZH vvbb Rate: 2.1 0.8 kHz u Similar gains for EM & Tau u MEt, Topological Triggers under study Jet Algo EM AlgoTau Algo
9
DØ Collaboration Meeting October 10, 2003 9 Technical progress: L1Cal ADC+digital filtering Clustering Global sums & topological
10
DØ Collaboration Meeting October 10, 2003 10 Signal Splitter Access to Real TT Data using “Splitter” Boards u designed/built by Saclay u active split of analog signals at CTFE input u 4 TTs per board u installed: Jan. 2003 Splitter Data u no perturbation of Run IIa L1Cal signals u allows tests of digital filter algorithm with real data
11
DØ Collaboration Meeting October 10, 2003 11 ~1300 components on both sides of a 14-layer class 6 PCB VME interface & glue logic Channel Link Serializers Core FPGA logic DC/DC converters Analog Section and ADCs VMEDigital OutAnalog In ADF Prototype
12
DØ Collaboration Meeting October 10, 2003 12 TAB Prototype power Channel Link Receivers (x30) Sliding Windows Chips (x10) L2/L3 Output (optical) VME/SCL Output to GAB Output to Cal-Track (x3) ADF Inputs (x30) Global Chip Internal Functions ~Fully Tested
13
DØ Collaboration Meeting October 10, 2003 13 VME/SCL Board New Comp. of TAB/GAB system u proposed:Feb 03 u change control:Mar 03 Interfaces to u VME (custom protocol) s not enough space on TAB for standard VME u D0 Trigger Timing (SCL) u (previously part of GAB) Why Split off from GAB u simplifies system design & maintenance u allows speedy testing of prototype TAB Prototype at Nevis: May 12 u main VME & SCL functionality tested & working serial out x9 (VME & SCL) VME interface SCL interface local osc’s & f’out (standalone runs) Fully Tested
14
DØ Collaboration Meeting October 10, 2003 14 TAB/GAB Test Card TAB/GAB Data Rates u TAB: LVDS 424 MHz s (channel link) u GAB: LVDS 636 MHz s (stratix) Test Card at Nevis u Start Designmid-Aug u Board at Nevis29-Sep u Cost~$2K Status u ADF-to-TAB xmit tested before integration u Will test TAB-to-GAB before sending out GAB for fabrication Channel Link TAB (ADF sim) power VME / SCL Cyclone Stratix S10 LVDS xmit/rcvr TAB (GAB in sim) Loopback
15
DØ Collaboration Meeting October 10, 2003 15 Prototype Integration Tests Want to start “System Tests” asap u need to check cross-group links early First Tests with Prototypes starting now u SCL VME/SCL TAB, ADF u BLS Data (split) ADF TAB u Flexible, staged schedule allows components to be included as they become available Set up semi-permanent Test Area (thanks to J. Anderson’s group at FNAL) u outside of Movable Counting House u connection to SCL, split data signals u allows L1Cal tests without disturbing Run IIa data taking
16
DØ Collaboration Meeting October 10, 2003 16 Technical progress: L1Cal-Track Trigger University of Arizona u J. Steinberg u D. Tompkins u C. Leeman u N. Wallace u B. Gmyrek u K. Johns u E. Varnes Exploit new L1Cal trigger Improve Run IIa matching granularity x8 Needed in triggers for Higgs searches electrons in WH and H W * W modes taus in H and H + Fake EM rejection is improved by ~x2 Fake rejection is improved by ~x10
17
DØ Collaboration Meeting October 10, 2003 17 Hardware Progress Block diagram of new Univeral Flavor Board: only really new board needed for L1 cal- track Flavor board (daughter) MTCxx (mother)
18
DØ Collaboration Meeting October 10, 2003 18 L1CalTrack Status MTCxx (Trigger Cards) u Preproduction design complete u Layout and final checks in progress u Goal is to submit in November 03 UFB (Flavor Board) u Prototypes in hand u Boundary scan and downloading OK u Receiver/transmitter testing in progress u L1MU “05” algorithm implemented in Stratix EP1S20F780C7 (simulated but not tested) u H algorithm implementation in progress MTCM (Crate Manger) u Not started, but only minimal changes to the existing design
19
DØ Collaboration Meeting October 10, 2003 19 L1CalTrack Status Infrastructure u VME crates, processors, power supplies, cables in hand u L1CTT to L1CalTrack cables being installed this weekend (not terminated) u Rack space in MCH1 identified (but not settled) Commissioning u Plan is to use spare L1MU cards in L1CalTrack crates to establish communication with TF and L3 u Replace spares with L1CalTrack cards as available Simulator u Work has started writing the L1CalTrack package and integrating it into the D0 Trigger Simulator
20
DØ Collaboration Meeting October 10, 2003 20 L1CTT Upgrade Boston Univ u M. Narain u G. Redner u S. Wu Fermilab u M. Johnson u J. Olson u F. Borcherding Notre Dame u M. Hildreth Manchester u L. Han u T. Wyatt Kansas u G. Wilson Brown u R. Partridge Indiana u K. Stevenson
21
DØ Collaboration Meeting October 10, 2003 21 Technical Progress: L1Central Tracking Trigger Tracking trigger rates sensitive to occupancy Upgrade stategy: u Narrow tracker roads by using individual fiber hits (singlets) rather than pairing adjacent fibers (doublets) u Cal-track matching
22
DØ Collaboration Meeting October 10, 2003 22 L1 CTT Implementation Digital Front End Axial (DFEA) daughter cards get replaced with new layout with larger FPGA’s (Xilinx Virtex-II XC2V6000) u Only 80 daughter cards get replaced; u rest of Run IIa system remains intact Baseline algorithms compiled; occupy ~40% of the resources of the XC2V6000’s. DFEA layout with new FPGA footprints
23
DØ Collaboration Meeting October 10, 2003 23 Run IIb L1CTT Progress Implemented prototype firmware (Boston U) u Includes equation files from all 4 momentum bins s p T >10 GeV, 5<p T <10 GeV, 3<p T <5 GeV, 1.5<p T <3 GeV Resources used: u DFEA logic is implemented in two FPGAs Prototype DFEA: 10/17/03 prototype PCB returned 10/31/03 first prototype assembled. 11/30/03 prototype fully tested
24
DØ Collaboration Meeting October 10, 2003 24 L2 eta Upgrade 6U board Compact PCI 9U board 64 bit <2MHz VME FPGA ECL Drivers 128 bits ~20 MHz MBus 32 bits 66MHz (max) Local bus 64 bits 33 MHz PCI J1 J2 J3 J5 J4 PLX 9656 UII Drivers Clk(s)/ roms Run IIb strategy: purchase additional, more powerful commercial processors as late as reasonably possible.
25
DØ Collaboration Meeting October 10, 2003 25 Silicon Track Trigger for Run IIb STT upgrade needed to u accommodate new L0? s New L0 fits within baseline Run IIb upgrade s even without L0, increase processing power for higher occupancy u Modest STT upgrade requires small quantity of same boards that are used in Run IIa. Readout layers 0,1,2,3,5 Technical Progress: VME Transition Modules procured u Concern about obsolescence Other procurements awaiting Layer 0 decision
26
DØ Collaboration Meeting October 10, 2003 26 Installation Words here about trigger installation u want to install as early as possible s most benefits u want to install during machine shutdown s where do we need the most access also repeat a little what we have in “the document” on installation
27
DØ Collaboration Meeting October 10, 2003 27 Summary Lots of trigger progress and potential Trigger workshop this weekend (Saturday/Sunday) u url trigger upgrade is being redefined in light of run2b prospects u installation schedule u new project approval will be happening in the next month u workshop this weekend
28
DØ Collaboration Meeting October 10, 2003 28 Backup slides follow
29
DØ Collaboration Meeting October 10, 2003 29 Fake rate vs.luminosity Even at modest occupancies, the high-p T single track trigger would fire at >15 kHZ Nominal 2E32 @ 396 ns (1 high pT track) (1 high+1 medium pT) 4E32 @ 396 ns Green points = Run IIa CTT Red points = Run IIb CTT
30
DØ Collaboration Meeting October 10, 2003 30 Run IIb L1CTT: Granularity Use full fiber resolution to restrict roads Run IIaRun IIb
31
DØ Collaboration Meeting October 10, 2003 31 L1CalTrack System Uses largely same hardware as existing L1muon u modest cost and effort required