Conclusions Three Design Tasks Completed. 1.Optimal locations of the inspection and overpacking cell(s). 2.Overpacking Cell considerations. 3.Inspection.

Similar presentations


Presentation on theme: "Conclusions Three Design Tasks Completed. 1.Optimal locations of the inspection and overpacking cell(s). 2.Overpacking Cell considerations. 3.Inspection."— Presentation transcript:

1 Conclusions Three Design Tasks Completed. 1.Optimal locations of the inspection and overpacking cell(s). 2.Overpacking Cell considerations. 3.Inspection Cell considerations. Results presented as recommendations.

2 1. Locations One centrally located Overpacking Cell. Eleven Inspection Cells, one on the ground floor at the front of each vault. The inclusion of an extra transfer tunnel is recommended, along side the existing tunnel.

3 1. Locations

4 2. Overpacking Cell The Overpacking Cell should only overpack packages. Layout Design A has been chosen.

5 3. Inspection Cell Inspection Scheme 2. Scheme 2 Level 1 All packages Documentation validation  Direct visual inspection  Master/Slave Manipulator held CCTV’  Radiation Level 2 Percentage of the packages or suspect packages  3D Mapping

6 3. Inspection Cell Inspection Cell Layout C2.


Download ppt "Conclusions Three Design Tasks Completed. 1.Optimal locations of the inspection and overpacking cell(s). 2.Overpacking Cell considerations. 3.Inspection."