Progress Report Regarding Redesign and Packaging of Adirondack Chair Team: 58 Project #F07-58ADRNDKCH Client: Garrett Cook Center For Comprehensive Services.

Similar presentations


Presentation on theme: "Progress Report Regarding Redesign and Packaging of Adirondack Chair Team: 58 Project #F07-58ADRNDKCH Client: Garrett Cook Center For Comprehensive Services."— Presentation transcript:

1 Progress Report Regarding Redesign and Packaging of Adirondack Chair Team: 58 Project #F07-58ADRNDKCH Client: Garrett Cook Center For Comprehensive Services Center For Comprehensive Services Team Members: William Fogerson Craig Craddock Jason Hick John Mathews & Mike Mayo

2 Outline Background on Client Background on Project Computer Simulation Physical Testing Packing Timeline AIL RASI Summary

3 Computer Simulation Modeling –Computer Aided Design 3D part drawings were constructed Parts were then assembled as required –Finite Elemental Analysis Stress analysis was performed on the original design and the new designs proposed Maximum principal stress was compared for each design

4 Computer Aided Design Autodesk Inventor

5 Computer Simulation Original Design 100 psi 100lbf Couple

6 Computer Simulation Cont’d 2x6 Design 100 psi 100lbf Couple

7 Computer Simulation Cont’d 1x6 Design with Bracing and Glue 100 psi 100lbf Couple

8 Physical Testing Test Set-up

9 Physical Testing Cont’d Average Force and Range of Force

10 Physical Testing Cont’d Range as a Percentage of Average Force

11 Packaging Procured Boxes, bubble wrap, and tape Provide Client with 2 options –Option A Smaller box therefore cheaper shipping cost Much more assembly required –Option B Larger box therefore more expensive to ship Less Assembly required

12 Timeline

13 AIL

14 RASI Legend ResponsibilityR ApprovalA SupportS InformationI Responsibility-Approval-Support-Information Chart TaskCCJHJMMMWFDr. Butson Arm TestingSRSRSA RedesignSRIRRA,I FEARSSSIA PackingSSRSIA Chair AssemblySRSRRA Assembly DirectionsIRSRIA ShippingSSRSIA

15 Executive Summary Team Members Background on Client Background on Problems Major Problems Major Changes Additional Resources

16 Questions ?