1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.

Similar presentations


Presentation on theme: "1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more."— Presentation transcript:

1 1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more likely Cold mass for the first magnet to be completed by the end of Sept., final magnet assy to begin soon Fabrication of parts for the thermal shields and vacuum vessels is complete, parts are @ vendor Assembly of the vacuum vessels and fabrication of the support stands are under way Overall winding of 2 nd magnet now ~70% complete All cold mass supp’ts complete, 300 A supplies in Apparatus for cooler tests under construction

2 2S. Virostek - LBNL Winding progress of 2 nd spectrometer solenoid magnet 9/11/07

3 3S. Virostek - LBNL Nearly completed cold mass for first spectrometer solenoid magnet 9/11/07

4 4S. Virostek - LBNL Internal wiring of first spectrometer solenoid magnet 9/11/07

5 5S. Virostek - LBNL Vacuum vessel warm bore tubes 9/11/07

6 6S. Virostek - LBNL 300 A power supply and controller 9/11/07