Presentation is loading. Please wait.

Presentation is loading. Please wait.

Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.

Similar presentations


Presentation on theme: "Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT."— Presentation transcript:

1 Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT

2

3 New layout Based on Mike Green’s data dated March 17, 2004 Dimensions in black represent positions of coils at room temperature Blue and magenta colors indicate dimensions change at 4.3 K

4 Plan view of ½ the magnet lattice and the outline of the modules vacuum vessels

5 AFC Module

6 RFCC Module

7 Integration of the cooling channel

8 Work in progress Revise the current magnet lattice information draw lattice plan and elevation Module to module interface design Installation stages of MICE Support structures Alignment


Download ppt "Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT."

Similar presentations


Ads by Google