MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December.

Similar presentations


Presentation on theme: "MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December."— Presentation transcript:

1 MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December 7, 2005

2 Mike Green & Steve Virostek - LBNL Page 2 Design and Procurement Status  The superconductor material is out for bid.  A conceptual design of solenoid module is complete.  A draft of solenoid build-to-spec is document done.  Tracker/patch panel interface discussions are ongoing.  The drawings/illustrations for spec are under development.  Most of the structural FEA work is completed at Oxford.  Wing Lau is in Berkeley next week to work with Mike Green and Steve Virostek towards completing specification.

3 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 3 Superconductor Material  Procurement spec was written by Mike Green  Quantity is sufficient to fabricate 2 complete solenoids  Bidding process is being handled by LBNL Purchasing.  Bids are due back by December 9, 2005.  The conductor purchase will be completed by IIT after bids are in and evaluated.  Delivery expected 17 weeks after receipt of order

4 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 4 Aluminum Mandrel End Coil 2 Center Coil Match Coil 1 End Coil 1 Match Coil 2 Coil Cover Liquid Helium Space 490 mm 690 mm 2535 mm Magnet Coil Package Magnet Mandrel

5 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 5 Cold Mass with Supports

6 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 6 Solenoid Module Interior Details

7 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 7 Module Exterior Details

8 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 8 Patch Panel Interface

9 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 9 Field Uniformity in Tracker Volume The region from Z = 4.7 m, Z = 5.7 m is uniform to better than ±0.3 percent from R = 0 to R = 0.15 m.

10 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 10 B Z Field at the Magnet Coolers The maximum B z at the cooler is 0.09 T..

11 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 11 B R Field at the Magnet Coolers The maximum B R at the cooler is 0.08 T..

12 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 12 Field at the VLPC Coolers VLPC At the VLPC the field is Less than 0.05 T.

13 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 13 Cooler around the Tracker  The coolers for the tracker magnet will see a magnetic field greater than 0.1 T. The specification calls for the use of a Cryomech PT-415 pulse tube cooler.  The VLPC cooler can be located in a region with a field of less than 0.05 T. The VLPC can be cooled by either the Sumitomo RDK-415D GM cooler or the Cryomech PT-415 pulse tube cooler.

14 December 7, 2005 Mike Green & Steve Virostek - LBNL Page 14 Concluding Comments  The superconductor material contract will be let very soon.  A conceptual design of solenoid module is complete.  A draft of solenoid build-to-spec is document done.  The drawings/illustrations for spec are under development.  Most of the structural FEA work is completed at Oxford.  The field in the bore is very uniform ±0.3 percent.  3 pulse tube coolers will be used for the tracker magnets.  Sumitomo Coolers can be used for the VLPC boxes.


Download ppt "MICE Spectrometer Solenoid Design and Fabrication Update Mike Green and Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference December."