Team Xerox Progress Report Mechanical Engineering Design Team Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt.

Similar presentations


Presentation on theme: "Team Xerox Progress Report Mechanical Engineering Design Team Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt."— Presentation transcript:

1 Team Xerox Progress Report Mechanical Engineering Design Team Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt Electrical and Computer Engineering Design Team Reuben Bellika Viet Bui PSU Faculty Advisor Mark Weislogel, PhD Xerox Industry Advisor Trevor Snyder, PhD

2 Overview Summary Summary DODVS Frame DODVS Frame Optic Mounting Assembly Optic Mounting Assembly Optics and Lighting Optics and Lighting BTM Frame BTM Frame BTM Automation BTM Automation Current Progress Current Progress Q&A Session Q&A Session

3 Summary Objective: produce a imaging system that is capable of capturing ink drops on the drum and on the paper at identical locations Current System: clumsy to use, vibrates excessively, and the optical system fails to meet the desired image quality Current System: clumsy to use, vibrates excessively, and the optical system fails to meet the desired image quality There is no specific imaging system that compares the drum images to paper images There is no specific imaging system that compares the drum images to paper images

4 Summary

5 Summary Oil is transferred from the maintenance roller to the drum before ink is transferred by the print head Ink transfer from drum to paper as the paper feeds between the transfix roller and drum

6 DODVS Frame

7

8

9

10

11

12 DODVS Final Frame Design Uses 3x6 inch T-Slot vertical supports Uses 3x6 inch T-Slot vertical supports ½ inch thick aluminum base and top plate ½ inch thick aluminum base and top plate Added gussets increase natural frequency Added gussets increase natural frequency

13 DODVS Frame

14 Optic Mounting Assembly Current system is heavy and cumbersome Current system is heavy and cumbersome

15 Optic Mounting New system rotates camera to side with one easy step.New system rotates camera to side with one easy step.

16 Optic Mounting (con’t)

17 Optics Existing camera and optic components will be reused to reduce cost Existing camera and optic components will be reused to reduce cost A second camera and optics will be purchased A second camera and optics will be purchased New optics system will have a magnification range of 3x to 21x New optics system will have a magnification range of 3x to 21x

18 Lighting Metal Halide lighting is best option, but may be cost prohibitive Metal Halide lighting is best option, but may be cost prohibitive Splitting current light source may be adequate Splitting current light source may be adequate

19 BTM Frame Same 3x6 inch T-Slot material Same 3x6 inch T-Slot material Same ½ inch thick base and top plate Same ½ inch thick base and top plate Reuses DODVS camera brackets Reuses DODVS camera brackets Features cover plates to hide messy electronics and wires. Features cover plates to hide messy electronics and wires.

20 BTM Automation XY Stage donated by Xerox, messy but it will work. XY Stage donated by Xerox, messy but it will work. Manual cranks will be added for a manual override feature Manual cranks will be added for a manual override feature EE’s are currently working on motor driver operation and integration. EE’s are currently working on motor driver operation and integration.

21 Current Progress DODVS and BTM frame designs are entering detail design stage, final drawings will be complete in a few weeks DODVS and BTM frame designs are entering detail design stage, final drawings will be complete in a few weeks Final decisions on optics and lighting will be made this weekend, and ordered next week Final decisions on optics and lighting will be made this weekend, and ordered next week Manufacturing of the frame assemblies begin in 4 weeks Manufacturing of the frame assemblies begin in 4 weeks On track for June 1 st completion date On track for June 1 st completion date