Download presentation
Presentation is loading. Please wait.
1
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio
2
2June 1 st 2009MICE CM24 - RAL2 - Beamline parallel session: - understand the readiness of the beamline - state of magnets with emphasis on DK solenoid - state of new target - diffuser - optics - knowledge of the beamline - emittance - rate (Lumi monitors?) - FermiLab monitors (location)? - state of other detectors: TOFs/GVAs? - discussion
3
D1 D2 Q4 Q1 Q2 Q3 Q5Q6Q7Q8Q9 3June 1 st 2009MICE CM24 - RAL3
4
Magnet Readiness MAGNETReadiness 1/6/09Power Connection Remote control PlumbingCryogenicsOtherReadiness 9/09 Q1 Q2 Q3 B117AUG-2SEP SHUTDOWN, reposition and test B1 moved to allow for iron shielding removal. Needs to be reconnected/testd VERY TIGHT SCHEDULE!!!!!!!! DK SolTested at ½ max current (5T) for short period. Need a long test at MAX current w. quench protection system when is it due? A complete test of the device is needed before commissioning. Should be OK by Sept 09, unless problem arise with long run test B2 Q4Plumbing Q5To be Q6Finished Q7By Q8??/??/09 Q9 4June 1 st 2009MICE CM24 - RAL4 table to be updated during the session …
5
5 BeamLines Availability April, 22 2009UKNF09 - Lancaster Reference Beam Line – muon (e,P=207 MeV/c) Beamlines for initial/calibration studies: from (a) with local momentum rescaling of the magnets [ with / without solenoid ] (infact we used the one with no DKsol for the aformentioned reasons) electron (@150 MeV/c) used for TOF calibration pions (@ 300 MeV/c) 1st muons seen protons (@480 MeV/c) 1st estimate of primary intensity 5June 1 st 2009MICE CM24 - RAL5 NB : need to introduce calib. current/field for DKsol
6
Muon BeamLine: G4BL simulation – Q1.DS + ------------ CALC_EMI ------------- + T= 0.196 mm rad x = 4.77 cm Y = 4.55 cm T = 38397 mm T = -7.105 RADIUS = 86.73 mm x= 0.2448 mm rad x = 32146 mm x= 9.68 x= 0.074 mm rad y= 0.1568 mm rad y = 45755 mm y= -32.9 y= 0.047 mm rad P=444.71 MeV/c Z=Q1DS X’ vs XY’ vs Y Y vs X mm rad 6June 1 st 2009MICE CM24 - RAL6
7
Muon BeamLine: G4BL simulation – TOF0 Y vs X P/P<10% P/P|>10% + ------------ CALC_EMI ------------- + N= 2.91 mm rad X = 4.51 cm Y = 7.02 cm = 2874.8618 mm = 0.129 RADIUS = 91.4828342 mm x= 3.49 mm rad x= 1400.4 mm x= 0.489 eX=1.47 mm rad y= 2.43 mm rad y= 4867.7 mm y= -0.392 eY=1.02 mm rad X’ vs X Y’ vs Y P=250 MeV/c Z=TOF0 7June 1 st 2009MICE CM24 - RAL7
8
Muon BeamLine: G4BL simulation – TOF1 + ------------ CALC_EMI ------------- + N= 2.47 (mm rad) X = 5.9 (cm) Y = 4.37 (cm) T = 2334 (mm) T = 0.86 RADIUS = 75.9 (mm) x= 2.60 x= 2872 mm x= 1.598 y= 2.35 y= 1727 mm y= 0.039 P=223 MeV/c Z=TOF1 8June 1 st 2009MICE CM24 - RAL8
9
Muon BeamLine: G4BL simulation – Diffuser + ------------ CALC_EMI ------------- + = 3.41 mm rad X = 4.35 cm Y = 4.88 cm T = 1250 mm T = -0.0017 RADIUS = 65.3 mm x= 3.76 mm rad x= 1004 mm x= 0.367 y= 3.10 mm rad y= 1534 mm y= -0.450 P=214 MeV/c Z=Diffuser 9June 1 st 2009MICE CM24 - RAL9
10
FermiLab Monitors: confirm locations and readiness? 10June 1 st 2009MICE CM24 - RAL10 Could be useful to determine beam alignment (together with TOF0/1)
11
11June 1 st 2009MICE CM24 - RAL11 Optics: are we ready? (shutdown 17 Aug/1 Sept) 2Sept – 25 Oct (see later talk for details) - On Sept 2 nd we don’t need a beam matched to … something - We can use optics for =6 mm rad / P=214 MeV/c [STEPII.1] - Rescale it to other momenta to cover STEPI + STEPII.0 - later (towards end of year) we need a properly matched beam for all the config. of STEPII.1 [trk-solenoid + diffuser] matrix completion - more work needed to tune DS-BL (Q4-9) to match MICE optics - we may want to test solenoid at B+/- B to increase rate 3 6 10 140 200 240
12
Q4 Q1 Dipole1 DK solenoid Q2Q3 Dipole2 Q5Q6Q7Q8Q9 1) beamline momentum tuning P =208 MeV/c P =444 MeV/c P =214 MeV/c fix D1 fix D2 2) beamline quadrupole tuning P =255 MeV/c 12June 1 st 2009MICE CM24 - RAL12
13
13June 1 st 2009MICE CM24 - RAL13 Summary - Assume target is working - Assess magnet readiness - DKsol strongly wanted - 5T to cover up to high P (MAX=240 MeV/c) - if NO DKsol back to situation of ’08 - Optics for STEPI/STEPII.0 should be fine as it is - Ongoing work to complete STEPII.1 matrix - Need to assess detector readiness - assume TOF0,1 + GVAs + FLMons are in place and alive
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.