GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.

Similar presentations


Presentation on theme: "GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of."— Presentation transcript:

1 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of data from different cosmic ray runs –We need real data to decide that Develop offline experience with GASU data –What is the deadtime per subsystem? –Need to implement that in MC Test entire chain –Event data parsing –Configuration data parsing –Report generation –Analysis cuts for E2E tests –Comparison of plots

2 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 2/6 Runs Database “Requirements” SVAC uses data from Online’s rc.out and/or snapshots We would like to have the following information for each data run –Run number –Start Date and time –Name of test script –LDF.FITS filename –Duration of test in seconds –Number of L1 triggers –Particle type (e.g. cosmic rays, photons) –Hardware type (e.g. 1 tower, EM, LAT) –Orientation (e.g. horizontal, vertical) –Completion status (e.g. success, failed, abort, undefined) –Links to test reports –Position of tower in a grid –Serial number of CAL, TKR and TEM modules –Number of towers in the configuration –Rate used for trigger tests –Which trigger input was used for coincidence window –Identifier from Gary’s matrix on what the E2E test is

3 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 3/6 First select run Select a run

4 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 4/6 Query List of Runs via the Web Run number Date Particle source Hardware type Hardware orientation

5 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 5/6 Configuration Report Register Settings

6 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 6/6 Register settings TKR GTRC Splits CAL FLE DAC Settings

7 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 7/6 Quality Report (1) Report file for the digi data (automatically generated after each data run)

8 GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 8/6 Run selection (2) Get run info produced by on line Get report containing info extracted from digi root file Get configuration info