Metrics Original prepared by: Sudipto Ghosh Revised: Aditya Mathur Latest update: October 28, 3003.

Similar presentations


Presentation on theme: "Metrics Original prepared by: Sudipto Ghosh Revised: Aditya Mathur Latest update: October 28, 3003."— Presentation transcript:

1 Metrics Original prepared by: Sudipto Ghosh Revised: Aditya Mathur Latest update: October 28, 3003

2 10/19/2003Metrics2 Learning objectives Software metrics Metrics for various phases Why are metrics needed How to collect metrics How to use metrics

3 10/19/2003Metrics3 Questions How big is the program? Huge!! How close are you to finishing? We are almost there!! Can you, as a manager, make any useful decisions from such subjective information? Need information like, cost, effort, size of project.

4 10/19/2003Metrics4 Quantifiable measures that could be used to measure characteristics of a software system or the software development process Required in all phases Required for effective management Managers need quantifiable information, and not subjective information Subjective information goes against the fundamental goal of engineering.

5 10/19/2003Metrics5 Kinds of software metrics Product metrics quantify characteristics of the product being developed size, reliability Process metrics quantify characteristics of the process being used to develop the software efficiency of fault detection

6 10/19/2003Metrics6 CMM Level 4: Managed level Process measurement performed Quality and productivity goals set Continually measured and corrective actions taken Statistical quality controls in place Level 5: Optimizing level Statistical quality and process control in place Positive feedback loop used for improvement in productivity and quality

7 10/19/2003Metrics7 Issues [1] Cost of collecting metrics Automation is less costly than manual method CASE tool may not be free Development cost of the tool Extra execution time for collecting metrics Interpretation of metrics consumes resources Validity of metrics Does the metric really measure what it should? What exactly should be measured?

8 10/19/2003Metrics8 Issues [2] Selection of metrics for measurement Hundreds available and with some cost Basic metrics Size (like LOC) Cost (in $$$) Duration (months) Effort (person-months) Quality (number of faults detected)

9 10/19/2003Metrics9 Selection of metrics Identify problems from the basic metrics high fault rates during coding phase Introduce strategy to correct the problems To monitor success, collect more detailed metrics fault rates of individual programmers

10 10/19/2003Metrics10 Utility of metrics LOC size of product take at regular intervals and find out how fast the project is growing What if # defects per 1000 LOC is high? Then even if the LOC is high, most of the code has to be thrown away.

11 10/19/2003Metrics11 Applicability of metrics Throughout the software process, like effort in person-months staff turnover cost Specific to a phase LOC # defects detected per hour of reviewing specifications

12 10/19/2003Metrics12 Metrics: planning When can we plan the entire software project? At the very beginning? After a rapid prototype is made? After the requirements phase? After the specifications are ready? Sometimes there is a need to do it early.

13 10/19/2003Metrics13 Metrics: planning graph of cost estimate Phase during which cost estimation is made Relative range of cost estimate RequirementsSpecificationsIntegrationDesignImplementation 2 3 4

14 10/19/2003Metrics14 Planning: Cost estimation Client wants to know: How much will I have to pay? Problem with underestimation (possible loss by the developer) overestimation (client may offer bid to someone else) Cost internal (salaries of personnel, overheads) external (usually cost + profit)

15 10/19/2003Metrics15 Cost estimation Other factors: desperate for work - charge less client may think low cost => low quality, so raise the amount Too many variables Human factors Quality of programmers, experience What if someone leaves midway Size of product

16 10/19/2003Metrics16 Planning: Duration estimation Problem with underestimation unable to keep to schedule, leading to loss of credibility possible penalty clauses Problem with overestimation the client may go to other developers Difficulty because of similar reasons as for cost estimation

17 10/19/2003Metrics17 Metrics: planning - size of product Units for measurement LOC = lines of code KDSI = thousand delivered source instructions Problems creation of code is only a part of the total effort effect of using different languages on LOC how should one count LOC? executable lines of code? data definitions comments? What are the pros and cons?

18 10/19/2003Metrics18 Problems with lines of code Problems More on how to count Job control language statements? What if lines are changed or deleted? What if code is reused? Not all code is delivered to clients code may be for tool support What if you are using a code generator? Early on, you can only estimate the lines of code. So, the cost estimation is based on another estimated quantity!!!

19 10/19/2003Metrics19 Estimating size of product FFP metric for cost estimation of medium-scale products Files, flows and processes (FFP) File: collection of logically or physically related records that are permanently resident Flow: a data interface between the product and the environment Process: functionally defined logical or arithmetic manipulation of data S = #Files + #Flows + #Process, Cost = b x S b: Organization dependent constant.

20 10/19/2003Metrics20 Techniques of cost estimation Take into account the following: Skill levels of the programmers Complexity of the project Size of the project Familiarity of the development team Availability of CASE tools Deadline effect

21 10/19/2003Metrics21 Techniques of cost estimation Expert judgement by analogy Bottom up approach Algorithmic cost estimation models Based on mathematical theories resource consumption during s/w development obeys a specific distribution Based on statistics large number of projects are studied Hybrid models mathematical models, statistics and expert judgement

22 10/19/2003Metrics22 COnstructive COst Model: COCOMO Series of three models Basic - macroestimation model Intermediate COCOMO Detailed - microestimation model Estimates total effort in terms of person-months Cost of development, management, support tasks included Secretarial staff not included

23 10/19/2003Metrics23 Intermediate COCOMO Obtain an initial estimate (nominal estimate) of the development effort from the estimate of KDSI Nominal effort = a X (KDSI) b person-months System ab Organic Semi-detached Embedded 3.2 3.0 2.8 1.05 1.12 1.20

24 10/19/2003Metrics24 Kind of systems Organic Organization has considerable experience in that area Requirements are less stringent Small teams Simple business systems, data processing systems Semi-detached New operating system Database management system Complex inventory management system

25 10/19/2003Metrics25 Kind of systems Embedded Ambitious, novel projects Organization has little experience Stringent requirements for interfacing, reliability Tight constraints from the environment Embedded avionics systems, real-time command systems

26 10/19/2003Metrics26 Intermediate COCOMO (contd.) Determine a set of 15 multiplying factors from different attributes (cost driver attributes) of the project http://sunset.usc.edu/research/COCOMOII/ Adjust the effort estimate by multiplying the initial estimate with all the multiplying factors Also have phase-wise distribution

27 10/19/2003Metrics27 Determining the rating Module complexity multiplier Very low: control operations consist of a sequence of constructs of structured programming Low: Nested operators Nominal: Inter-module control and decision tables High: Highly nested operators, compound predicates, stacks and queues Very high: Reentrant and recursive coding, fixed priority handling

28 10/19/2003Metrics28 COCOMO example System for office automation Four major modules data entry:0.6 KDSI data update:0.6 KDSI query:0.8 KDSI report generator:1.0 KDSI Total:3.0 KDSI Category: organic Initial effort: 3.2 * 3 1.05 = 10.14 PM (PM = person-months)

29 10/19/2003Metrics29 COCOMO example (contd) From the requirements the ratings were assessed: ComplexityHigh1.15 StorageHigh1.06 ExperienceLow1.13 Programmer CapabilityLow1.17 Other ratings are nominal (=1.0) EAF = 1.15 * 1.06 * 1.13 * 1.17 = 1.61 Adjusted effort = 1.61 * 10.14 = 16.3 PM

30 10/19/2003Metrics30 Metrics: requirements phase Number of requirements that change during the rremainder of the software development process if a large number changed during specification, design, …, something is wrong in the requirements phase Metrics for rapid prototyping Are defect rates, mean-time-to-failure useful? Knowing how often requirements change? Knowing number of times features are tried?

31 10/19/2003Metrics31 Metrics: specification phase Size of specifications document may predict effort required for subsequent products What can be counted? Number of items in the data dictionary number of files number of data items number of processes Tentative information a process in a DFD may be broken down later into different modules a number of processes may constitute one module

32 10/19/2003Metrics32 Metrics: specification phase Cost Duration Effort Quality number of faults found during inspection rate at which faults are found (efficiency of inspection)

33 10/19/2003Metrics33 Metrics: design phase Number of modules (measure of size of target product) Fault statistics Module cohesion Module coupling Cyclomatic complexity Fan-in, fan-out

34 10/19/2003Metrics34 Mccabe’s Cyclomatic Complexity Number of independent test paths=edges-nodes+2 1-2+2=1 Straight line code 4-4+2=2 if-then-else 3-3+2=2 while-do

35 10/19/2003Metrics35 McCabe’e Cyclomatic complexity Number of binary decisions + 1 The number of branches in a module Lower the value of this number, the better Only control complexity, no data complexity For OO, cyclomatic complexity is usually low because methods are mostly small also, data component is important for OO, but ignored in cyclomatic complexity

36 10/19/2003Metrics36 Architecture design as a directed graph Fan-in of a module: Fan-out of a module: number of flows out of the module plus the number of data structures updated by the module Measure of complexity: length X (fan-in X fan-out) 2

37 10/19/2003Metrics37 Metrics: implementation phase Intuition: more complex modules are more likely to contain faults Redesigning complex modules may be cheaper than debugging complex faulty modules Measures of complexity: LOC assume constant probability of fault per LOC empirical evidence: number of faults related to the size of the product

38 10/19/2003Metrics38 Metrics: implementation phase McCabe’s cyclomatic complexity Essentially the number of branches in a module Number of tests needed for branch coverage of a module Easily computed In some cases, good for predicting faults Validity questioned Theoretical grounds Experimentally

39 10/19/2003Metrics39 Metrics: implementation phase Halstead’s software metrics Number of distinct operators in the module (+. -. If, goto) Number of distinct operands Total number of operators Total number of operands

40 10/19/2003Metrics40 Metrics: implementation phase High correlation shown between LOC and other complexity metrics Complexity metrics provide little improvement over LOC Problem with Halstead metrics for modern languages Constructor: is it an operator? Operand?

41 10/19/2003Metrics41 Metrics: implementation and integration phase Total number of test cases Number of tests resulting in failure Fault statistics Total number of faults Types of faults misunderstanding the design lack of initialization inconsistent use of variables Statistical testing: zero-failure technique

42 10/19/2003Metrics42 Zero failure technique The longer a product is tested without a single failure being observed, the greater the likelihood that the product is free of faults. Assume that the chance of a failure decreases exponentially as testing proceeds. Figure out the number of test hours required without a single failure occurring.

43 10/19/2003Metrics43 Metrics: inspections Purpose: to measure the effectiveness of inspections may reflect deficiencies of the development team, quality of code Measure fault density Faults per page - specs and design inspection Faults per KLOC - code inspection Fault detection rate - #faults / hour Fault detection efficiency - #faults/person-hour

44 10/19/2003Metrics44 Metrics: maintenance phase Metrics related to the activities performed. What are they? Specific metrics: total number of faults reported classifications by severity, fault type status of fault reports (reported/fixed)

45 10/19/2003Metrics45 References Textbook Roger Pressman: Chapters 4, 19 Other books P. Jalote - An Integrated Approach to Software Engineering (Look at metrics under Index) Internet reference www.cs.waikato.ac.nz/~bernhard/314/schachSlides/ schach5-chap09- 14%5B1%5D.ppt