Download presentation
Presentation is loading. Please wait.
1
Target: K. Long, 16Nov2009
2
Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and Torlon delivery expected ~12 December In parallel: – Checking forces generated with mis-aligned coils using OPERA model (PS, TB): ongoing – Devising magnetic QA rig (GB + Shf): ongoing – Devising concept for winding coils that is more precise Schedule T3: – Machining of parts progressing well – Coils for T3 prepared in Sheffield: » Will consider whether to use new coils or present coils based on: magnetic analysis; Magnetic QA on T2 stator
3
T3 schedule: T3 schedule still looks OK: – Need to expedite ‘R&D’ work on T2#3 Which is in hand
4
Controls schedule: Stage 1 of controller upgrade still on track for early next year
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.