MyBeats Michael Smith
2
Integration Plans Entry Criteria Integration and Testing Error Documentation and Resolution Exit Criteria
3
Generic Entry Criteria Unit Tested Entry Point Exit Point
4
Integration Modules chained together Testing: For each module, its entry point must be able to handle all possible values as output from the previous modules exit point
5
Error Resolution If error detected Add to source control notes Analyze to find source Plan a rework to resolve issue Implement the rework
6
Error Resolution 2 Unit Test any modified modules Test the integration again If successful Mark problem as resolved
7
Exit Criteria Error Free Fully Integrated Move on to the next stage
8
Next Stage Tuning Modifying the heuristic values and functions to produce a more enjoyable user experience Similar to Beta testing But work still being performed
9
Process Layout
10
Entry and Exit Points
11
Process Control
12
Program Stubs Track Generator Module Dummy functions and values Can’t fully develop algorithm until results can be seen Midi Generator Random notes to find restrictions placed by Frets on Fire
13
Remaining Schedule Fine tune heuristic algorithms Mike for remaining time Ogg generator module Karen and Dylan for next couple weeks Playing the game Mike, Dylan, and Karen