Download presentation
Presentation is loading. Please wait.
1
Meet the Team Abraham Taleb 4 th Year Industrial Engineer Jose Rodriguez 5 th Year Industrial Engineer Aaron Heyman 5 th Year Industrial Engineer Adam Cook 5 th Year Industrial Engineer Sarah Pittman CooperVision Process Improvement Manager RIT Class of 1997
2
Project Description World's Second leading Producer of Contact Lenses 250,000 Sq Ft. Distribution Center in Henrietta Process Improvement Opportunities Proposals for CooperVision Detailed proposals of process improvements in both written and presented forms. Precise instructions on implementation of specific process improvements that cannot be executed by the team, due to constraints in the approval process. Potential implementation of approved process improvements.
3
Deliverables Status Project Overview – Complete 1 Page Summary – Complete Work Breakdown Structure – Complete Quarter Schedule – Complete
4
Key Challenges Not enough time on site (Mitigations: site agenda) High number of SKU’s Optimizing the part not the whole Customer wants to expand scope. Inability to make changes that require modifications in existing software.
5
Key Challenges (cont.) Approval of proposed improvements may take a long time. (Mitigations: generate proposals early.) Possible known and unknown factors that will limit possible changes
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.