Download presentation
Presentation is loading. Please wait.
1
Beta-caryophyllene 250ppb NOx 117 ppb Dp 13.6 Thursday 13 March 2008
2
Pre-exp procedure completed according to schedule
3
First DMPS scan (13 min after lights on) DMPS mass 29.7 ugm-3, about 3.4e4 p/cc 115 nm
4
33 min after lights on DMPS mass 95.5 ugm-3, about 3.3e4 p/cc 171 nm
5
83 min after lights on DMPS mass 124.4 ugm-3, about 2.9e4 p/cc 217 nm
6
113 min after lights on DMPS mass 147.7 ugm-3, about 2.6e4 p/cc 217 nm
7
193 min after lights on DMPS mass 141.1 ugm-3, about 19e3 p/cc 241 nm
8
223 min after lights on DMPS mass 136.1 ugm-3, about 17e3 p/cc 246 nm
9
Last DMPS run (4 hours 3 min) DMPS mass 136.1 ugm-3, about 16e3 p/cc 246 nm
10
15:34 post exp complete O3 conc. is 2010ppb
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.