Download presentation
Presentation is loading. Please wait.
1
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status of Construction and Technical System Installations Mike Scharfenstein Project ES&H Coordinator
2
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 2 Environment Safety & Health Construction / Installation Experience Technical Systems Readiness Operations
3
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 3 Technical Installation Safety Performance ActivityScope Results 2006 Injector System InstallationPersonnel Protection System stopper, Spectrometer, L1 accelerator section & Bunch Compressor 1 No injuries 2007 Beam Transfer System Installation Installed Bunch Compressor 2 & L3 No injuries 2008 Beam Transport Hall to Beam Dump Installation Beam line equipment, racks, cables, etc No Injuries
4
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 4 Construction Safety Performance ActivityScopeResults S20 Alcove & Injector B081 Magnet Measurement Facility Direct oversight Demolition, excavation, steel erection No injuries Research Yard PreparationDirect oversight FFTB demolition/ high hazard/complex No injuries BTH-W upgradeDirect oversight Mech / Elect / Plumbing No injuries Electrical Substation 522Direct oversight High voltage work/ complex One first-aid case Site Civil Construction / TunnelingSite clearance, construction, tunneling High hazard/ complex 9 lost work day cases 3 recordable cases 10 first-aid cases
5
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 5 Construction Safety November (mid) 2008 – Substantial Completion 146 Days without lost time incident - Major Milestone Safety in GC managed work a disappointment Aggressive Management Steps Weekly Senior Executive - Conference Calls & On-Site Meetings Increased LCLS & TCCo field staff Full-Time On-Site Nurse Full time DOE field presence Lessons Learned
6
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 6 Lessons Learned Require: Go/No Go Joint Review of GC work packages by Owner and CM Owner and CM to actively participate in development and conduct of initial work until satisfied the GC understands/demonstrates requirements Flow-Down Go/No Go Review to sub-contractor work GC to actively participate in development and conduct of initial work until satisfied the S/C understands the requirements monitor S/C work assignment meeting, and participate in execution of the first few work activities Communicate to contractors: Safety regulations are monitored for compliance daily Procedures for permitted work must be followed in detail Accidents investigations will result in work stoppage, that may extend several days
7
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 7 Systems Installations & Readiness Reviews Technical Component Installation No safety incidents Work planning model for SLAC Readiness Review of Undulator Complex – Dec 2008 Coordination Mtgs with committee to date Installation complete before review Readiness Review for Experiment Stations – March 2009 Initial coordination discussion Radiation studies underway LUSI Readiness Review – 2010 CD 2 Completed September Technical reviews
8
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 8 Operations Users scheduled for August 2009 Accelerator Systems Safety System reviews Engineering Physics ARR December 2008 Undulators installation Experimental Facilities Technical Support Program User Support Program Experiment Safety Review Program Collaborating with SSRL Evaluating approaches at other facilities
9
Mike Scharfenstein FAC Review - Plenaryscharf@slac.stanford.edu November 11, 2008 SLAC National Accelerator Laboratory 9 end of presentation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.