SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLAC SPC Meeting December 3, 2004
2
SLAC Accelerator Department Topics Highlights of Run 4 of PEP-II Summer 2004 down General future plans
3
SLAC Accelerator Department Contributors to PEP-II SLAC LBNL LLNL With help from: –IHEP, Beijing, China –BINP, Novosibirsk, Russia –INFN, Frascati, Italy –CEA, Saclay, France –IN2P3, Paris, France –Caltech –BNL –Many people from the BaBar Collaboration –Visitors from CERN, DESY, Cornell, FNAL, KEK, …
4
SLAC Accelerator Department PEP-II e + e - Collider Use the SLAC linac as upgraded for the SLC for the injector. BaBar Detector Feedbacks Diagnostics LER RF 476 MHz HER RF 476 MHz 3.1 GeV positrons x 9 GeV electrons C = 2200 m
5
SLAC Accelerator Department PEP-II HER RF cavities
6
SLAC Accelerator Department PEP-II Interaction Region Components near BaBar HER LER Collision point BaBar
7
SLAC Accelerator Department PEP-II Machine Advisory Committee Reviews PEP-II Machine Advisory Committee –1) Jan 4-6, 1995 –2) August 24-25, 1995 –3) April 11-13, 1996 –4) January 6-8, 1997 –5) November 10-13, 1997 –6) December 14-16, 1998 –7) October 9-11, 2003 –8) April 15-17, 2004 –9) December 13-15, 2004
8
SLAC Accelerator Department Improvements in FY2004 –Peak luminosity: 6.6 9.2 10 33 –Number of bunches: 1050 1588 bunches by-2 pattern (24 long mini-trains) with 2% ion gap –Parasitic collision effects seen but small(<5%) –Electron Cloud (ECI) effects are small (<2%) –I current 1500 2450 mA (3 RF stations) –I current 1050 1550 mA (8 RF stations) y * of 12 11 mm –All data now taken in trickle charge mode Both beams: LER in November, HER in March
9
SLAC Accelerator Department Daily Integration Record with Trickle Injection 710/pb LER I HER I Luminosity
10
SLAC Accelerator Department Peak luminosity of 9.21 x 10 33 Record Peak Luminosity
11
SLAC Accelerator Department Trickle injection at the B Factories Best shift, no trickle PEP-II: ~5 Hz continuous KEKB: at ~5-10 min intervals Best shift, LER only trickle Nov 2003 Best shift, double trickle Mar 2004 PEP-II Lumi HER current LER current
12
SLAC Accelerator Department Trickle Charge: Length of Fill
13
SLAC Accelerator Department PEP-II Run Time Dist. FY 04 M. Stanek Pre-trickleLER-trickleDouble-trickle
14
SLAC Accelerator Department
15
SLAC Accelerator Department PEP-II Performance Measure: Peak Luminosity
16
SLAC Accelerator Department Run 1 Run 2 Run 3 Run 4 CD4 Design Performance
17
SLAC Accelerator Department
18
Total >240 fb -1 !
19
SLAC Accelerator Department Summer 2004 PEP-II Improvements IR2 south forward shield wall: Backgrounds Add another new LER RF station: Higher current Add a HER RF station by splitting up a current 4 cavity station into two 2 cavity stations: Higher current Two new “Frascati” longitudinal kickers in LER: More stability New electrodes for transverse kickers: More stability Add fans to all HER bellows: Cool Higher Order Modes (HOMs) Alignment work (quadrupole rolls): Smaller vertical emittance New LER synchrotron light monitor: Smaller vertical emittance IR NEG pump HOM reduction: Better lifetime and backgrounds New Support Tube Chiller: Higher currents
20
SLAC Accelerator Department New IR2 Shield Wall for BaBar IFR
21
SLAC Accelerator Department LER NEG Test chamber
22
SLAC Accelerator Department Lab test data of NEG outgassing as a function of temperature LER NEG Pump Temperatures Upstream LER side 350 °F
23
SLAC Accelerator Department Existing 3082 chamber BPM Chamber support Cooling bar NEG plenum NEG heater Quad extrusion
24
SLAC Accelerator Department Chamber shown inverted and plenum not shown for clarity SiC HOM absorber
25
SLAC Accelerator Department New bellows design with HOM absorber Kurita Novokhatski Weathersby
26
SLAC Accelerator Department IR Vacuum Chambers Vertex Bellows Q1/Q2 Bellows
27
SLAC Accelerator Department VTX Bellows Cooling Installation
28
SLAC Accelerator Department Forward VTX BLWS Cooling
29
SLAC Accelerator Department Thermo Model (May 2001) for 100 Watts Power input behind fingers.
30
SLAC Accelerator Department New Be bellows design SiC Cooling
31
SLAC Accelerator Department HER Single-Bunch Synchroscan Data at 16 MV
32
SLAC Accelerator Department Comparing Single-Shot and Synchroscan Data LER e+
33
SLAC Accelerator Department New LER Synchrotron Light Monitor Improved resolution Single bunch capabilities
34
SLAC Accelerator Department
35
Luminosity versus Crossing Angle Without parasitic crossing With parasitic crossing
36
SLAC Accelerator Department Luminosity Equation y is the beam-beam parameter (~0.065) I b is the bunch current (1 to 3 mA) n is the number of bunches (~1600) y * is the IP lattice optics function (vertical beta) (10 mm) E is the beam energy (3.1 and 9 GeV) Luminosity (10 33 cm -2 s -1 )
37
SLAC Accelerator Department Future luminosity increase factors ParameterPresentFutureLuminosity gain ratio Hardware and work needed LER current2450 mA4500 mATwo RF stations, new IR vacuum chambers HER current1550 mA2200 mA 1.61Two RF stations, new IR vacuum chambers y*y* 10.5 mm8.5 mm 1.24HER higher tunes, RF & power supplies work yy 0.065 L 0.043 H 0.070 L 0.055 H 1.17Tune plane, coupling, & IR work Parasitic x 3.22 mm3.80 mm 1.08B1 magnet change (?) Total x 2.52
38
SLAC Accelerator Department Overall Parameters and Goals ParameterUnitsDesign Best in collision Future 2007 goal I+mA214024504500 I-mA75015502200 Number bunches 165815881715 y*y* cm15-20118.5 yy 0.030.045, 0.070.055-0.08 Luminosityx10 33 3.09.223 Integrated lumi / day pb -1 1307101600 Over five times design! Over three times design Twice design
39
SLAC Accelerator Department PEP-II Future Luminosity Parameters xx yy xx yy nI x*x* y*y* Lumi xx yy Unitscmmmnm mA mm mm x1E33 LER now 3210.5331.55161624501034.09.210.0530.065 LER 2007 288471.80172045001153.823.00.0650.070 HER now 3310.5601.30161615501393.79.210.0520.043 HER 2007 288661.60172022001363.623.00.0630.055
40
SLAC Accelerator Department Expected PEP-II Delivered Integrated Luminosity Delivered as of end of fiscal yearPEP-II Projection“Delta” FY2004256/fb117/fb FY2005387131 FY2006528141 FY2007821293 FY20081156335 FY20091501345 FY20101847346
41
SLAC Accelerator Department Future Maintenance Down Activities Install LER-5 RF station Install HER-10 RF station Remove support tube for SVT work to fix radial ion pump and add an IR BPM Upgrade several high-power IR vacuum chambers (Be bellows, Q4, Q5, high power dump, Q2 bellows, LER abort window, straight section bellows …) HER lattice upgrade for lower momentum compaction and shorter bunches New RF comb filters New klystron linearizer New transverse digital feedback processors
42
SLAC Accelerator Department Conclusions PEP-II has reached a luminosity of 9.2 10 33 /cm 2 /s. PEP-II has delivered 710 pb -1 in one day. PEP-II has delivered over 117 fb -1 in Run 4! PEP-II has delivered over 256 fb -1 since May 1999. Trickle injection in both rings all of the time. Near term upgrades are going well. Planned upgrades toward 2.3 10 34 are on track. Progress on studying a Super-B-Factory.