Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tomokazu Matsuo TOHO University.M2 Experience: CS Production in Gran Sasso CS Scan, Manual check ECC Vertex analysis Main works: Make plate changer #2.

Similar presentations


Presentation on theme: "Tomokazu Matsuo TOHO University.M2 Experience: CS Production in Gran Sasso CS Scan, Manual check ECC Vertex analysis Main works: Make plate changer #2."— Presentation transcript:

1 Tomokazu Matsuo TOHO University.M2 Experience: CS Production in Gran Sasso CS Scan, Manual check ECC Vertex analysis Main works: Make plate changer #2. Scanback task force member.

2 Direct ScanBack - Scanback without SUTS - 2009-01-20 TOHO Univ.Tomokazu Matsuo Nagoya Univ.N. Kitagawa, M. Kazuyama, Umut Kose, T. Naka. Aichi Kyoiku Univ.K.Kodama

3 Direct Scan Back location(DSB) Scanback without SUTS scanning PL 1,2 Start from Dec./'08 CS (SUTS & UTS) PL1&2 (SUTS & UTS) Scanback (PLCH with navigation) ECC volume scan (SUTS) CS (SUTS & UTS) Scanback (PLCH without navigation) ECC volume scan (SUTS) First methodDSB method If DSB failed >> SUTS PL1,2 scan

4 Merit * save time 1 st method: 30min (PL1,2 SUTS scan) + SB DSB:<10min (find track on Pl.1) + SB System upgrade: Semi-automatic CS X-ray measurement soft * save machine resource SUTS: 30 min/ev. * skip process Cut the waiting time > analysis speed up Save human resource

5 34 DSB 23 connected 11 not connected Go to PL 1,2 SUTS Scan 8 vtx confirmed 12 stopped Result of DSB 3 penetrate or edgeout SUTS load 1/3

6 Unconnected events Strategy: Scan PL.1,2 by SUTS 11 total Wait scanning 7 Recovered 2 Sendback to CS 2 1 inefficiency of drylens 1 bad parameter (already fixed)

7 Track position and angle in Pl.1 that connected from CS to Pl.1 Tracks of 23 connected events

8 The difference between Prediction calculated by tracks on CS and Tracks found on ECC

9 Summary We have started a new procedure, DSB We can Save Resource (SUTS,UTS) Success ratio is 70% now. >> It will become better.

10

11 ここまでしかないよ

12 2 Recovered1 Edge out 1 Wait scanback

13 2 Recovered1 drylens 1 bad parameter (already fixed)

14


Download ppt "Tomokazu Matsuo TOHO University.M2 Experience: CS Production in Gran Sasso CS Scan, Manual check ECC Vertex analysis Main works: Make plate changer #2."

Similar presentations


Ads by Google