Defense Waste Processing Facility 257 Actual Canisters Produced in FY05 37% Waste Loading (averaged for FY05) 1,995 Total Canisters Produced (as of the10/31/05 start of an ongoing DWPF outage) Sludge Batch 3 began feeding to DWPF in April 2004 and is expected to last to March 2007 Sludge Batch 4 forecast ready date is January 2007 and is expected to serve as feed to DWPF through March 2009
2
Glass Waste Storage Building #2 (as of 10/21/05)
3
Issues and Challenges Availability of federal repository Completion of NDAA Section 3116 process Salt Processing Tank Closure Re-design of SWPF based on DOE decision to implement additional requirements Reassessment of interim salt strategy