Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group
2
Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Work on system design à Breakout boards ordered à Sensor connectors specified and ordered Solenoid Valves received ARC PC Card Cage received
3
Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Solid State Relays Arrived Lab View Errors Resolved à File for digital temperature sensor addresses à File for run history required Power Transformer Board Layout
4
Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs NIM Crate from SLAC with plugins Move BaBar Chiller in CMS Test Lab Plumb dry air to test system
5
Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Solenoid Valve Panel Layout for shop Complete Schematics for Analog I/O and Digital I/O Breakout Boards Set up Temperature Sensors and verify calibration and Communication à Read unique sensor firmware addresses à Generate Digital Sensor file
6
Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Fabricate Analog I/O Breakout Board Test Humidity Sensor against Sensirion sensor Fabricate Power Transformer board Reverse Engineer Peltier Relay Board from CERN