Download presentation
Presentation is loading. Please wait.
1
Oct. 5 th 2011 8 th International Workshop on Heavy Quarkonium 2011 Jim Ritman Mitglied der Helmholtz-Gemeinschaft Status of PANDA
2
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 2 Overview Summary of PANDA physics potential Facility FAIR PANDA Charmonium Benchmark Channels c → → K + K - K + K - (3770)→D + D - X(3872) Width Determination of the D s0 *(2317) Conclusions
3
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 3 Summary of PANDA physics potential Confinement Why are there no free quarks? Hadron mass Where is the mass of the proton coming from? Are there other color neutral objects? What is the structure of the nucleon? What are the spin degrees of freedom?
4
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 4 Summary of PANDA physics potential Meson spectroscopy: D mesons charmonium glueballs, hybrids, tetraquarks, molecules Charmed and multi-strange baryon spectroscopy Electromagnetic processes ( pp→e + e -, pp→ , Drell-Yan) Properties of single and double hypernuclei Properties of hadrons in nuclear matter
5
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 5 FAIR Facility FAIR → L. Schmidt’s talk on Oct. 4 th Founding of FAIR: Oct. 2010 Submission of building permits: Aug. 2011 Financing of HESR Jun/Oct 2011 (RESR !) You are here HESR
6
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 6 HESR 10 11 Antiprotons from 1.5-15 GeV/c, fixed target L=10 32 (Initially without RESR, stacking in HESR) Stochastic and electron cooling s=20-100 keV
7
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 7 PANDA Forward Spectrometer Dipole Magnet Target Spectrometer
8
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 8
9
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 9
10
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 10 Micro-Vertex-Detector
11
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 11 Central Tracker
12
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 12 Central Tracker Low mass, X/X 0 ~1% 1.5 kg Straw tubes (4580×2.5g) Close-packed layers pressurized p=2bar 9 kg Mechanical frame r ~ 150 m, z ~ 2.9 mm p ~ 1% at B = 2 Tesla dE/dx (~8%) measurement for PID
13
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 13 Simulations of Charmonium Benchmark Channels
14
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 14 Performance Simulations for c → → K + K - K + K - Benchmark channel to study kaon tracking performance MC-PID P beam = 3.677 GeV/c BR = 0.0027×0.5×0.5 D. Melnychuk, Warsaw DIRC DEDX
15
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 15 Invariant mass distributions single events20 MHz Rate Performance Simulations for c → → K + K - K + K -
16
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 16 Performance Simulations for (3770)→D + D - Benchmark channel to study vertexing P beam = 6.579 GeV/c BR = 0.30×0.095×0.095 M. Mertens, Juelich and D. Kang, Mainz
17
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 17 Performance Simulations for (3770)→D + D - 4C Kinematic fit applied Acc.×Eff. = 5.0% Only VTX-fit ~ 30 MeV
18
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 18 X(3872) Detailed presentation this afternoon by M. Galuska, Giessen (40 days)
19
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 19 Width Determination of the D s0 *(2317) Nature of D s0 * (2317) unclear Interpretation very sensitive to width ~ keV - MeV Current upper limit < 3.8 MeV does not discriminate interpretations PANDA will do a resonance scan to achieve a precision better than 100 keV B.Aubert, PRD 74,032007
20
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 20 Excitation Function Scan of the D s0 *(2317) Method Sensitivity to width Effect of the beam resolution p/p ~ 10 -4 M. Mertens, Juelich
21
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 21 Excitation Function Scan of the D s0 *(2317) Simulated excitation function 2 -contour Resolution of the width
22
Jim Ritman, Institut für Kernphysik (IKP) Juelich Slide 22 Summary/Conclusions FAIR is on-track HESR is funded, calls for tender ready to go PANDA going into construction phase Despite competion, PANDA has unmatched physics reach
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.