Download presentation
Presentation is loading. Please wait.
1
Polish Tier-2 Andrzej Olszewski Institute of Nuclear Physics Kraków, Poland October 2005 – February 2006
2
Polish HEP(LHC) centres Cracow (Kraków) Institute of Nuclear Physics, University of Science and Technology ATLAS (12 physicists, 3 PhD students), LHCb (7+1), ALICE Neutrino, Belle ZEUS, H1 Warsaw (Warszawa) Institute for Nuclear Studies, University, Technical University CMS (5 physicists, 6 PhD students, ~3 engineers), LHCb, Alice COMPASS Neutrino
3
Polish LCG/EGEE centres ● Cracow: CYFRONET – Academic Computer Centre http://www.cyfronet.pl/ ● Warsaw: ICM – Interdisciplinary Centre for Mathematical and Computational Modelling http://www.icm.edu.pl/ ● Poznań PCSS – Poznań Supercomputing and Networking Centre http://www.man.poznan.pl/
4
Polish network GDAŃSK POZNAŃ ZIELONA GÓRA KATOWICE KRAKÓW LUBLIN WARSZAWA BYDGOSZCZ TORUŃ CZĘSTOCHOWA BIAŁYSTOK OLSZTYN RZESZÓW BIELSKO-BIAŁA GÉANT KOSZALIN SZCZECIN WROCŁAW ŁÓDŹ KIELCE PUŁAWY OPOLE RADOM BASNET 34 Mb/s CESNET, SANET 10 Gb/s Local network 1 Gb/s
5
Cracow computing centre Available for LCG in early 2006: ● ~130 kSi2000 80 CPUs (Xeon 2.4 – 2.8 GHz) available now 200 CPUs (Xeon 2.8 Ghz) coming soon ● ~20 TB disk array
6
Warsaw computing centre Available for LCG in early 2006: ● ~290 kSi2000 180 CPUs (AMD Opteron 2.4GHz, 2GB RAM/CPU ) available now 40 CPUs (AMD dual-core, 4GB RAM/CPU) coming soon ● ~9 TB disk array
7
Poznań computing centre Available for LCG in early 2006: ● ~180 kSi2000 100 CPUs (Itanium 2GB RAM/CPU) available now ~90 more coming soon, details not yet fixed ● ~2 TB disk array ● ~5 TB tape storage ➔ Operation centre for Polish academic network
8
Tier-2 federation ● Poland is a federated Tier-2 ● HEP community rather small (~60 people) ● Each of the computing centres naturally will support mainly 1 experiment Cracow – ATLAS Warsaw – CMS Poznań – ALICE (because they have Itanium processors) ● This means that each centre will be about 1/3 of the average/small Tier2 for a given experiment
9
Oct-Feb Progress ● Procurement of new hardware finalized at Cracow (+200 CPU) and Warsaw (+88 CPU) ● Polish internal 1Gbit/s VLAN network setup between Poznan, Cracow, Warsaw finalized and tested ● Setup of the outbound connection from Poznan to Tier1 FZK Karlsruhe is under arrangements ● Pilot attempts of installation of services for SC4 have mostly succeeded, but services not yet in production
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.