Development of Transmission System Master Plan of Oman ( )

Similar presentations


Presentation on theme: "Development of Transmission System Master Plan of Oman ( )"— Presentation transcript:

1 Development of Transmission System Master Plan of Oman (2014-2030)
Dr. Adil Ghalib Al-Busaidi, PhD, MSc, BEng, CM, MIEEE Asset Management and Planning Manager Oman Electricity Transmission Company

2 Outline Introduction Methodology of the Master Plan development
Preliminary studies Transmission Master Plan results Findings, recommendations & way forward

3 Introduction Why we need Master planning?
To avoid costly reworks and upgrades Control time and effort Coordination across the sector Have insight into the future challenges Knowing the potential growth areas Know the future challenges and get prepared for it (new types of equipment…)

4 Introduction- continued
How we are going to use it? Decide voltage levels Medium term plan shall be compatible with the long term needs Securing overhead lines routes & grid stations locations Coordination of efforts with main stakeholders Plan for the required contracting strategies, financial resources and human resources Master Plan 5YCS 5 years window Detailed Investments decisions Strategic network structure Short circuit ratings Voltage level 15 years window

5 Methodology of the Master Plan development
Preliminary studies Transmission Master Plan 2030 Target Transmission Structure List of investments Phasing of investments Cost estimation and recommendations

6 Preliminary studies-security criteria
Data gathering from stakeholders: Planning studies Strategic documents for energy sector Technical standards (generation, transmission,…) Socio-economic data (population changes, GDP growth,…) Definition of planning criteria & standards based on: Grid Code Transmission Security Standards International standards

7 Preliminary studies-load demand forecast
Two complementary methods used: Global [National level]: based on macroeconomic indicators (population changes, GDP,…) Area-based [Local level]: based on forecasted development of each area

8 Preliminary studies-generation expansion plan
Capacity Adequacy Analysis: Objective = advise additional capacity required by 2030 Generation Scenarios: Objective = determine adequate location for additional capacity Capacity Adequacy + Generation Scenarios Final Generation Expansion Plan

9 Preliminary studies-generation expansion plan

10 Transmission Master Plan results-2030 transmission structure
Coastal Backbone Evacuation of new coastal power plants (Sohar, Shinas, Suwayq,…) Interconnection with UAE (GCCIA) and possibly Iran in future Inner-Land Backbone Evacuation of Ibri power plant Southern Ring Evacuation of Sur 1&2 power plant

11 Transmission Master Plan results-2030 transmission structure
In addition: 4th EHV route to connect Duqm & Dhofar systems Potential interest for PDO 2018 development of the Inner-Land backbone + connection SFZ–Mhadah (UAE) development of 400kV to supply Muscat area development of the Coastal backbone interconnection MIS-Duqm-Dhofar closing of the Southern Ring MIS Duqm Dhofar PDO

12 Transmission Master Plan results-key changes
2014 2030 400kV : not existing 220kV : transmission network 132kV : sub-transmission network Well meshed in Muscat area No SVCs 220kV = transmission of power 132kV = supply of load 400kV : transmission network 220kV : sub-transmission network 132kV : “distribution” network Split in Muscat area SVCs in Muscat 400kV = transmission of power 220&132kV = supply of load

13 Transmission Master Plan results-phasing of investments
2018 development of the Inner-Land backbone + connection SFZ–Mhadah (UAE) development of 400kV to supply Muscat area development of the Coastal backbone interconnection MIS-Duqm-Dhofar closing of the Southern Ring

14 Findings, recommendations & way forward
Development of the EHV (400kV) network to serve as the main transmission back bone Reinforcement of HV (220&132kV networks) to serve as sub-transmission system and provide enough injection points for the load demand Recommendation: Interconnection of Duqm and Dhofar networks with the MIS Way forward: Discussions with DISCOs on new grid stations locations Issue tenders for routes surveys of the new lines Coordinate with concerned authorities for securing the lands and corridors Long term financial planning and contracting strategies Build technical capabilities to meet the future needs

15 Q&A ???? 15