AIM Program Software Status
In-process means planned and funded.
2
AIM Program Software Includes:
AIM I AIM II AIM Learning Object Module Content Planning Module In-process means planned and funded.
3
AIM Training Traditional “Buttonology” Courses AIM I
2 FY 15 convenings, 1 on each coast AIM II 6 convenings CPM/LO Module 16 convenings In-process means planned and funded.
4
E2E Training Taught or expected to be taught at every learning center or fleet concentration area Approximately 50% of the convenings in the Hampton Roads area Distance Learning version of current E2E ILT course planned for facilitated asynchronous delivery via NETC N7 Sakai instance In-process means planned and funded.
5
E2E Training Training in support of the NETC E2E Process NAVEDTRAs
NETC End-to-End Process SOP Three new topics in design: BCA – FEA in govt review R3 (Reuse, Repurpose, Reference) – integrated into the DL Videos, retrofitting into ILT course Reengineering – in JDTA currently In-process means planned and funded.
6
AIM Program Updates In-process means planned and funded.
7
AIM Update December 2014 Added support for multiple Volumes in LP
Fixed summary display in the CMS Fixed issues with CMS Events for non-CCMM site Added support for multiple Volumes in LP Added support for adding distribution statements to the cover page of the TPP, TCCD, LP, TG In-process means planned and funded.
8
AIM Update December 2014 (contd)
LP Preview automatically turns to PDF if over pages Changed the terminology from IMI (Interactive Media Instruction) to IMM (Instructional Media Material) Added "Save Source File As..." and a "Save As..." menu items to the Graphics module In-process means planned and funded.
9
AIM Update December 2014 (contd)
Changed PC Simulation support in the Site RRL, moving it from a separate category to be a subset of IMM. Increased the field size for number and supplier fields. Fixed issue when printing the TG and the S/HAN contains section breaks In-process means planned and funded.
10
AIM Update December 2014 (contd)
When editing sheet content, software should no longer hang if trying to edit a document that is blocked by Word 2010's security settings. Updated TPP functionality based on feedback from TPP Working Group Expanded performance assessment support In-process means planned and funded.
11
CPM Update 2nd QTR FY15 TPP updates from TPP Working Group
OCCSTD import into JDTA Expanded Field Level Help in CPM Expanded PC Simulation in RRL In-process means planned and funded.
12
CPM Update 2nd QTR FY15 (contd)
Multicenter Roles for CPM users Remedy printing, data import, and JDTA copy issues in CPM Correct Lesson length Change IMI to IMM In-process means planned and funded.
13
Future AIM / CPM Updates
Improved Lesson Plan formatting Versioning – Create new versions of only those Modules/Lessons/Sections that actually need to be modified. Remaining content stays at its current approved version Course Master Schedule fixes Front End Analysis (FEA) Table of Specifications (TOS) In-process means planned and funded.
14
Future AIM / CPM Updates (contd)
Track Access/Changes to data in AIM I/AIM II/LO Module Data Retention of CPM Data Versioning Resources / Data / KSATRs Portion Marking OCCSTD Versioning In-process means planned and funded.
15
LO Module Integration into CPM – ‘Webification’
Long-term NETC plan is to integrate LO Module functions into CPM as a fully web-based application In-process means planned and funded.
16
Phase 1 Core of LO Module creation in CPM
delivered and accepted by govt Jan 14
17
Phase 2 Significant improvements in importing LO Module files, “filled in holes” from Phase 1 Approved FEB 15
18
Future Development Phase 3 (100% of desktop client functionality and operational replacement for LO Module desktop client): unfunded Schedule and required funding are TBD based on several factors, including: ECP to capture functional and technical design, scope cost, and determine schedule – especially editor and printing issues freeze of desktop client enhancements that will need to be incorporated into the Phase 3 version of webified LO Module
19
Issues Replace current Word editor for TG sheets with web-based editor and migrate existing Word-based TG Sheets into new editor Identify, test, and implement new print engine Work with NETC N6 to scope server requirements and network bandwidth to support far greater user and data load on CPM than current Plan, Analyze, and Design phases of ISD process In-process means planned and funded.
20
Next Steps Start work by ‘Webification’ Working Group chartered by NETC N74 in Dec 14 Define functional requirements for the ECP analysis, functional/technical design, costing, and schedule Begin analysis and design of NETC IT architecture to support implementation of integrated Web-based CPM/LO Module – especially new SSC NOLA configuration N7/FRB/CCB determine when to freeze enhancements to desktop client LO Module Task/fund ECP for Phase 3 ‘webification’ In-process means planned and funded.
21
AIM Support Currently handled by NAWCTSD, with contractor support
Planning for eventual transition to REMEDY, with appropriate planning and implementation