HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to 0.20 mile east of CR400W Length of 8.46 miles with 9 Bridges INDOT DESIGN CONSULTANT: Bernardin Lochmueller & Associates, Inc. Jeff Whitaker, P.E.
3
Section 2: Central Segment Current Design Status Road & Bridge Design - 50% Complete R/W Engineering – 50% Complete
4
Section 2: Central Segment Work Schedule Hydraulic Review & Grade Review (Completed 2007) Context Sensitive Solution Design (Completed August 28, 2008) Preliminary Field Check of Road & Bridge (February 23, 2009) Public Information Meeting (August 27, 2009) Design Approval (September 2009)
5
Section 2: Central Segment Right-of-Way Schedule R/W Engineering & Acquisition (2008- 2011) 90 Parcels of Property 26 Relocation R/W Appraising (Oct/Nov 2009-April 2010) Property Information
6
Construction Schedule Phase 2A - (November 2010- 2012) Phase 2B – (March 2011-2013) Phase 2C – (December 2011-2013) Phase 2D – (October 2011-2013 ) Section 2: Central Segment
7
Alignment Issues: Alignment was shifted on SR 25 and Connector Roads to avoid Environmental Sensitive Areas Alignment shifted on SR 218 because of an at-grade Railroad Crossing Alignment shifted on Connector Road between the New SR 218 and Existing SR 218 Robinson Branch Bridge Added: Because of Environmental Stream Impacts & Wetland Seeps Upstream Bridge Creek Bridge Added: Because of hydraulics & cost savings Section 2: Central Segment
8
Main Street Access Local Officials Requested – Main Street Access Revised Improve Entrance into Delphi Signature Bridge for the Monon Trail Section 2: Central Segment
11
Context Sensitive Solutions - Deer Creek Valley Rural Historic District Committee Stakeholders Total of 4 Meetings, Last Meeting August 28, 2008 Context Sensitive Design Solutions Texturing & Coloring of the Retaining Walls & Bridge Piers Shape of Bridge Piers Type of Bridge Railing Type of Landscaping Type of Lighting at Main Street Section 2: Central Segment
18
HOOSIER HEARTLAND HIGHWAY Thank You For Coming Questions Contact: Aimee Kindred, Public Involvement Director Office: (317)234-4938 Mobile: (317)517-2166 Fax: (317)233-4929 Email: Akindred@indot.in.gov