Presentation is loading. Please wait.

Presentation is loading. Please wait.

Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014.

Similar presentations


Presentation on theme: "Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014."— Presentation transcript:

1 Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014

2 2 Comprehensive Explanation  Target Date: 12/2018  SCOPE: ECAC – All States except SK  Electronic dialogue as automated assistance to controller during coordination and transfer addresses the facilities and processes between ATC components serving ATC units.  ATC17 complements ITY-COTR.  Purpose:  Co-ordination prior to the transfer of flights from one ATC unit to the next;  Transfer of communication from one ATC unit to the next ATC unit of such flights;  Support the exchange of OLDI messages related to the Basic procedure and, if applicable, SSR Code Assignment Message. ESSIP Plan 2014 / Objective ATC17

3 3 What is new or has changed for ESSIP Plan ed. 2014  Deletion of SLoA REG01 on safety oversight (action carried across the ESSIP Plan ed. 2014) ESSIP Plan 2014 / Objective ATC17

4 4 Link to European ATM Master Plan and/or Interim Deployment Programme (IDP) Eur. ATM Master Plan:  [CM-0201] – Automated Assistance to Controller for Seamless Coordination, Transfer and Dialogue IDP:  WP 5.2 ESSIP Plan 2014 / Objective ATC17

5 5 Most important SLoA(s)  All  Note: whereas this objective is defined with an ECAC scope, it will be the decision of the individual ATS Provider to:  define its local applicability in terms of relevant ATSUs, and  identify the processes to be implemented (refer to ATC17 SLoAs and in particular, their finalisation criteria, for the complete list of processes). ESSIP Plan 2014 / Objective ATC17

6 6 Finalisation Criteria and Closed Questions For ASP01:  Deliver safety arguments for all changes related to implementation of electronic dialogue for Coordination and Transfer. For ASP02/3/4 (important to clearly identify ATSUs involved and which processes are implemented):  Ground systems updated  Technical File with evidences of compliance to EC Declaration of Verification;  Functions (form the list in it he individual SLoAs) documented and in operational use. For ASP05:  Training plans updated and training package developed by the ANSP for the use of electronic dialogue procedure. ESSIP Plan 2014 / Objective ATC17

7 7 Supporting Material  EUROCONTROL-Specification for On-Line Data Interchange (OLDI) Edition 4.2 (OJEU Reference 2011/C 146/05)  EUROCONTROL-System Supported Coordination (SYSCO) Implementation Guidelines ESSIP Plan 2014 / Objective ATC17

8 8 ESSIP Report 2014  Objective introduced in the ESSIP Plan in 2012.  By end of 2013, 1 State has reported it as completed; 6 reported it partially completed (functionalities available and ATCOs trained but not implemented operationally). This requires agreement with neighbouring ACCs where the same functionalities must be available.  From the reported ANSP plans, the current estimate for achievement is 12/2018. ESSIP Plan 2014 / Objective ATC15

9 9 Links and contacts  Objective Coordinator: Dell’Orto Luca, +32 2 729 3325 luca.dellorto@eurocontrol.int  EUROCONTROL Objective Expert: Stephen Morton, +32 2 729 3492 stephen.morton@eurocontrol.int ESSIP Plan 2014 / Objective ATC17


Download ppt "Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR 19.09.2014."

Similar presentations


Ads by Google