Presentation is loading. Please wait.

Presentation is loading. Please wait.

Partner guidance – engagement phase 2  The Architectural Design phase and the Fit Gap phase are required for 5, 10 and 10 day engagement (please refer.

Similar presentations


Presentation on theme: "Partner guidance – engagement phase 2  The Architectural Design phase and the Fit Gap phase are required for 5, 10 and 10 day engagement (please refer."— Presentation transcript:

1

2 Partner guidance – engagement phase 2  The Architectural Design phase and the Fit Gap phase are required for 5, 10 and 10 day engagement (please refer to the engagement guide)  These phase should follow the assessment phase, which should have been preformed during the first 3 days of the engagement  The architectural design, fit gap analysis and the recommendations provided to the customer should be developed using the results and information gathered, using Life Cycle Services, during the assessment phase.  Fit Gap analysis is also a required phase for a 5 days or more engagement. Therefore, you can choose if to preform the architectural design phase first or in parallel to the fit Gap phase.  Please refer to the Fit Gap detailed delivery guide also provided as part of the engagement materials.

3

4

5

6

7

8

9

10

11

12

13


Download ppt "Partner guidance – engagement phase 2  The Architectural Design phase and the Fit Gap phase are required for 5, 10 and 10 day engagement (please refer."

Similar presentations


Ads by Google