Presentation is loading. Please wait.

Presentation is loading. Please wait.

A CTIVE T RANSPORTATION P ROGRAM (ATP) General Draft Application Info & Application Part A.

Similar presentations


Presentation on theme: "A CTIVE T RANSPORTATION P ROGRAM (ATP) General Draft Application Info & Application Part A."— Presentation transcript:

1 A CTIVE T RANSPORTATION P ROGRAM (ATP) General Draft Application Info & Application Part A

2 G ENERAL D RAFT A PPLICATION I NFORMATION 2 ATP Cycle 2 Caltrans Workshop The Cycle 2 application will be in 3 parts again: Part A: “General Project Information” PDF fillable must have free version 8 or higher Part B: “Narrative Questions is a Word document- Part C: “Application Attachments” There are some that are required You will be submitting 5 sets of all 3 parts plus a disk or flash drive.

3 P ART A. G ENERAL I NFORMATION 3 ATP Cycle 2 Caltrans Workshop These 2 yellow boxes will auto- fill. We will be using to “Project Unique Application No as our Application tracking number.

4 P ART A. G ENERAL I NFORMATION 4 ATP Cycle 2 Caltrans Workshop

5 P ART A. G ENERAL I NFORMATION - CONT ’ D 5 ATP Cycle 2 Caltrans Workshop

6 P ART A. G ENERAL I NFORMATION - CONT ’ D 6 ATP Cycle 2 Caltrans Workshop

7 P ART A. G ENERAL I NFORMATION - CONT ’ D 7 ATP Cycle 2 Caltrans Workshop

8 P ART A. G ENERAL I NFORMATION - CONT ’ D 8 ATP Cycle 2 Caltrans Workshop

9 P ART A. G ENERAL I NFORMATION - CONT ’ D 9 ATP Cycle 2 Caltrans Workshop

10 P ART A. G ENERAL I NFORMATION - CONT ’ D 10 ATP Cycle 2 Caltrans Workshop

11 P ART A. G ENERAL I NFORMATION - CONT ’ D 11 ATP Cycle 2 Caltrans Workshop

12 P ART A. G ENERAL I NFORMATION - CONT ’ D 12 ATP Cycle 2 Caltrans Workshop

13 P ART A. G ENERAL I NFORMATION - CONT ’ D 13 ATP Cycle 2 Caltrans Workshop

14 P ART A. G ENERAL I NFORMATION - CONT ’ D 14 ATP Cycle 2 Caltrans Workshop

15 P ART A. G ENERAL I NFORMATION - CONT ’ D 15 ATP Cycle 2 Caltrans Workshop On the SOF Subject the CTC’s ATP Guidelines say: “The intent of the Commission is to consolidate the allocation of federal funds to as few projects as practicable. Therefore, the smallest project may be designated, at the time of programming, for state-only funding.”

16 P ART A. I MPORTANT I NSTRUCTIONS 16 ATP Cycle 2 Caltrans Workshop Once you have finished filling in all of the Part A of the application, save it (using the Unique Project Application Number- 04 Marin County 05), and save it (Part A 04 Marin County 05) to the disk or flash drive that you will be submitting with your application. Do not scan Part A and put it on the disk. We need this data to be “live” so we can up load it to our scoring spreadsheet; and our database, if your project is selected! This the first of 2 files we want submitted electronically (by disk or flash drive).

17 VIII. A PPLICATION S IGNATURES 17 ATP Cycle 2 Caltrans Workshop Cycle 2 still does Not require a resolution, just the signatures

18 CALTRANS IMPROVES MOBILITY ACROSS CALIFORNIA California Department of Transportation Division of Local Assistance Office of Active Transportation & Special Programs 1120 N Street, MS 1 Sacramento, CA 95814 April Nitsos, P.E. Office of Active Transportation and Special Projects- Chief April.nitsos@dot.ca.gov Office (916) 653-8450 FAX (916) 653-1905 www.dot.ca.gov CALTRANS IMPROVES MOBILITY ACROSS CALIFORNIA California Department of Transportation Division of Local Assistance Office of Active Transportation & Special Programs 1120 N Street, MS 1 Sacramento, CA 95814 Kevin Atkinson, P.E. SRTS Manager & Bike/Ped. Tech. Specialist Kevin.atkinson@dot.ca.gov Office (916) 653-6920 FAX (916) 653-1905 www.dot.ca.gov 18 ATP Cycle 2 Caltrans Workshop


Download ppt "A CTIVE T RANSPORTATION P ROGRAM (ATP) General Draft Application Info & Application Part A."

Similar presentations


Ads by Google