Download presentation
Presentation is loading. Please wait.
Published byJustina King Modified over 9 years ago
1
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 1 95th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks March 8-13, 2015 Estrel Hotel and Convention Center Berlin, Germany
2
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 2 802.15 Organization Chart 802.15WG Chair Bob Heile, ZigBee Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Task Groups Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing Working Group Technical Editor James Gilb SCs for New Projects (WNG), Maintenance, Rules Chair: Pat Kinney, Kinney Consulting TG8 Peer Aware Communcations Miung Lee, CUNY Chair TG9 Key Management Protocol Robert Moskowitz, Verizon Chair Study Groups/Interest Groups TG4n 15.4 China MBAN PHY Art Astrin, Astrin Radio Chair TG15.4q Ultra Low Power (ULP) 15.4 Shahriar Emami, Samsung Chair TG4r 15.4 Distance Meas. Tech (DMT) Dietrmar Eggart, Atmel Chair Study Groups: High Rate Close Proximty Chair: Andrew Estrada Sony Interest Groups TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig Dependability (of Radio Links) Ryuji Kohno, High Rate Rail Communications Chair: Junhyeong Kim, ETRI 6Tisch Chair: Pat Kinney, Kinney Consulting To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15www.ieee802.org/15 TG10 Layer 2 Routing Clint Powell Chair x TG3d 100Gbps PHY Thomas Kuerner, Chair Technische Universität Braunschweig TG4s Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories TG7R Optical Wireless Communications Yeong Min Jang, Kookmin University Chair
3
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 3 Berlin Session Objectives March 8-13, 2015 TASK GROUP 3d –100Gbps THz PHY 1.Review and Discuss Contributions 2.Update Project Plan/Timeline TASK GROUP 4n –China MBAN 1.Will Complete first Sponsor Ballot 2.Resolve Resolve Ballot comments 3.Update Project Plan/Timeline Task Group 4q: 15.4 Ultra Low Power Amendment 1.Resolve received comments on recirc2 2.Seek conditional approval to start sponsor ballot 3.Update Project Timeline accordingly
4
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 4 Berlin Session Objectives March 8-13, 2015 Task Group 4r Distance Measurements Techniques 1.Call for Nominations for a TG Chair 2.Prepare the CFP 3.Update Project Timeline TASK GROUP 4s Spectrum Resoucre Utilization(SRU) 1.Work on Technical Guidance Doc (TGD) 2.Prepare the CFP 3.Update Project Timeline Task Group 7R Optical Wireless Communications (OWC) 1.Hold a project tutorial for 802 2.Begin Developing TGD 3.Generate/Update Project Timeline
5
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 5 Berlin Session Objectives March 8-13, 2015 TASK GROUP-8 Peer Aware Communications 1.Continue work on draft 2.Update Project Plan/Timeline TASK GROUP 9 –Key Management Protocol: 1.Letter Ballot Comment Resolution 2.Seek cond. approval to start Sponsor Ballot 3.Update Project Plan/Timeline TASK GROUP 10--Layer 2 Routing (L2R): 1.Finalize draft 2.Seek approval to start Letter Ballot 3.Update Project Plan/Timeline
6
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 6 Berlin Session Objectives March 8-13, 2015 High Rate Close Proximity Study Group: 1.Secure approval for the PAR and CSD 2.Begin work on developing a draft 3.Develop draft timeline THz Interest Group: 1.Hear presentations relating to THz comms. 2.Review ongoing mission/goals Dependability Interest Group: 1.Hear Contributions 2.Discuss future of the Committee
7
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 7 High Rate Railroad Communications IG 1.Discuss opportunities for standards work 2.Review ongoing mission of the group 6 TiSCH Interest Group 1.Hear contributions 2.Discuss positions for IETF92 NEW PROJECTS SUBCOMMITTEE (WNG) 1.ULP presentation by James Gild Maintenance Standing Committee 1.15.4 Revision activity- Finish Comment Resolution 2.Seek Conditional Approval to start Sponsor Ballot Berlin Session Objectives March 8-13, 2015
8
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 8
9
doc.: IEEE 802.15-15-0175-00 Submission March 2015 Robert F. Heile, ZigBee AllianceSlide 9 Upcoming Sessions May 10-15, 2015, Hyatt Regency Vancouver, Vancouver BC, CA 802 Wireless Interim Session.* July 12-17, 2015, Hilton Waikoloa Village, Big Island, HI, US, 802 Plenary Session. September 13-18, 2015, Centara Bangkok, Bangkok, Thailand, 802 Wireless Interim Session.* November 8-13, 2015, Hyatt Regency Dallas, Dallas, TX, USA, 802 Plenary Session. January 17-22, 2016, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Wireless Interim Session.* (100 th Session of 802.15) March 13-18, 2016, Sands Venetian Hotel Macau, PRC (TBC), 802 Plenary Session. May 15-20, 2016, Hilton Waikoloa Village, Kona, HI, USA, 802 Wireless Interim Session.* July 24-29, 2016, Grand Hyatt Manchester, San Diego, CA, USA, 802 Plenary Session
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.