Download presentation
Presentation is loading. Please wait.
Published byVivian Russell Modified over 9 years ago
1
MRV & Reporting Status & Related Space Data Needs CAMBODIA SDCG-7 Sydney, Australia March 4 th – 6 th 2015
2
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 2 In Cambodia, the discussion on NFMS started in a form of discussion on database development. In the process of discussing the contents of the database for the storage of data related to MRV and WEB based database for information dissemination, role of NFMS has gradually been recognized by stakeholders. On December 22, 2014, a Workshop was held to review the discussion on NFMS at MRV/REL Technical Team meetings and to clarify things to do for the design of NFMS of Cambodia. While demarcation between SIS is still being discussed, relation between each component of NFMS will be summarized as a diagram on next slide.. Scope and timeline for implementation
3
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 3 component of NFMS
4
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 4 Also, in the end of December 2014, a draft strategy for initial REL calculation was prepared. In making the draft strategy, the following conditions were considered: – Requirement of UNFCCC – Time of submission of REDD+ national strategy and REL – Available data – Available human resources Space Data Needs
5
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 5 In summary, the scope of this initial REL is: – Scale: National (Wall to Wall) – Activities considered: Deforestation – Carbon pool: AGB – GHG: In principle CO2 These scope is also applied to NFMS. Space Data Needs
6
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 6 But scope of NFMS should also include following factors. Data collection cycle Data collection method – by field survey or field survey in combination with satellite based survey Type of data to be collected by NFMS and SIS Space Data Needs
7
7 Indicators 4.3: Web-based satellite monitoring system developed; monitoring system includes data on past and current forest cover changes 2014 Results: Joint development of a land use and land use change map series by FA, UN-REDD, JICA and FFPRI – 2005/2006 map; completed – 2010 and 2013/2014 map; in progress First version web-platform developed; Training conducted; Structure of web-platform agreed (Support by FAO). Next steps for 2015 Completion of the land use and land use change series Development of web-platform REDD+ activity data and satellite forest monitoring system SDCG-7 Sydney, Australia March 4 th – 6 th 2015
8
Example of a layer displaying AGB plots and Ecological zones
9
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 9 Space Data Needs Required Space Data Types Landsat 8 (wall to wall) and very high resolution satellite data (Rapid eye – for training data and validation) Radar data to supporting on the NFI Capacity building to improve current methodologies Processing tools and/or software How to intergrade map with inventory plot ? The good quality of seasonal data mosaic. Capacity building on time series change map. LiDa data for monitoring on forest degradation, selecting cutting and Forest Biomass estimation Spot data for monitoring on Forest Fire
10
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 10 Space Data Needs Development of the National MRV System for the Cambodia Refined methodology for land cover mapping Integration of different data sources (resolutions, date of observation, optical and radar) to fill gaps in nationwide land cover mapping Access to high-resolution images due to limited financial resources or data sharing issues Current Challenges and Obstacles
11
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 11 Space Data Needs High cost of processing tools/software Sustainable access to data and processing tools Capacity building on Sentinel 2 processing data Insufficient training on RADAR image processing How to intergrade map with RS data Coordination with international space agencies that provides free access to their satellite imageries/data Current Challenges and Obstacles
12
SDCG-7 Sydney, Australia March 4 th – 6 th 2015 12 Thank You For Your Attention Mrs. Sar Sophyra Contact address: FORESTRY ADMINISTRATION #40 Norodom BVLD, Daun Penh, Phnom Ppenh, CAMBODIA. Email: sophyra.sar@gmail.com
13
Space Data Needs Scope and timeline for implementation – Areas, wall-to-wall, dates Required space data types – Data heritage and/or plans Current challenges & obstacles where GFOI assistance may be most valuable Maximum of 5-6 slides SDCG-7 Sydney, Australia March 4 th – 6 th 2015
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.