1 SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Updates from Winter 2015 Meeting Mohsen Shavandi Virgilio Garcia

2 SC 17 Report Winter 2015 Appointed liaisons with Materials group, International Standards, Industry Standardization 28 document (7 New), 14 TRs (8 New TR) 17A (RP) – Design and Operation of Subsea Production Systems Under revision SRRR submitted for Annex A and Annex I to be a separate documents (proposed TR13 and TYR14) Material section to be reviewed and revised 17D (Spec) –Subsea Wellhead and Christmas Tree Equipment Addendum for Annex O being balloted Ballot closed for removal of PSL 3G for wellheads 17E (Spec) –Subsea Umbilicals Draft will be sent for comment and ballot 17F (Std) –Subsea Production Control Systems 3rd edition published in May 2014 SRRR submitted to start the next edition to address issues from previous edition 17G (RP) –Completion Workover Risers 6th draft will be completed by end of February The next revision is recommended to be balloted as Standard rather than Specification Document size reduced by 20%

3 SC 17 Report Winter 2015 17H (RP) – ROTs and Interfaces n Subsea Production Systems Incorporate 17M (17M is withdrawn) SRRR  submitted and accepted for next revision Will issue errata now for figure 20 (Hot stab dimensions) Deep Star Task report: API agreed to accept report as Donated work from Deep Star Deep Star grants API permission to issue report under SC17, but retain ownership of report Document will be under API 17H umbrella 17K (Spec) –Bonded Flexible Pipe Up for review, the industry input due by Q1 2015, work will extend into Q1 2016 Established input requirements and task group (29 SMEs) 17N (RP) - Subsea Reliability Incorporate existing 17Q content to introduce TQ process RP due for next revision 17P (RP) –Subsea Structures and Manifolds SRRR submitted to update and rationalize the materials section Next meeting to be scheduled 17R (RP) –Flowline Connectors and Jumpers Resolved comments from ballot; will send out for recirculation and publication

4 SC 17 Report Winter 2015 17S (New RP) – Subsea Multiphase Flow Meters
Ballot closed in December 2014 In comment resolution, will be submitted for re-ballot 17U (New RP) –Wet and Dry Thermal Insulation of Subsea Flow Lines and Equipment In publication process 17V  (New)- Subsea Safety Ballot comments reviewed and incorporated In final circulation; to be published in February 17Y (New RP) –Subsea Chemical Injection SRRR submitted in June 2014 Work in progress 17X (New RP) – Subsea Boosting Under development (started Jan 2013) Expect the first draft by April 2015 17Z (New RP) –Boded Composite Pipe for Offshore Applications TG to formed by end of Q and the draft is targrted for end of Q3

5 SC 17 Report Winter 2015 TR7- Connectors (except flowline connectors)
Annex I to be completed and recirculated Waiting on 17G technical team to free up SC16 encouraged to get involved in review TR8 – HPHT Design Guidelines Passed ballot; 1st edition to be published in February Motion passed for SRRR  to get CSOEM to put aside $345,000 to perform independent analysis and material testing Motion passed to start the 2nd edition ASME Section VIII Div 3 task group is helping with the material section We encourage SC 18 to participate TR9 –Subsea Umbilical Termination Selection and Sizing Recommendations Document to be completed in April 2015 TR10-Subsea Umbilical Termination Design Recommendations recommended to be re-balloted due to addition of two complete sections TR12- In final review; 2 negative votes being addressed

6 SC 17 Report Winter 2015 THANK YOU!