Download presentation
Presentation is loading. Please wait.
Published byNoreen Goodman Modified over 9 years ago
1
16.9.2014 Olli-Pekka Penttilä Director of Statistics / Co-ordinator Finnish Customs Nordic meeting 2014 Preparation for exchange of micro-data on intra-EU trade between Member States SIMSTAT-Pilot ESSnet
2
16.9.2014Nordic meeting2 Outline of SIMSTAT: Short background Task of the ESSnet1 (Pilot) Work plan Organisation of the work Next steps Discussion
3
16.9.2014Nordic meeting3 Background and history (1) Intrastat began operating 1 Jan 1993 most burdensome area of business statistics in addition, perceived burden (by PSI’s) is an issue many initiatives to deliver reform achievements not sufficient
4
16.9.2014Nordic meeting4 Background and history (2) lack of consensual solution conflicting priorities of Member States need to unblock the situation new element, what can it be? the analogy to administrative data double collection of data is an opportunity EU legislation cannot force MS to reduce burden
5
16.9.2014Nordic meeting5 The proposal from 2012 – SIMSTAT 1.Reduce data collection requirements on the intra-EU imports (arrivals) side. 2.Enable Member States to design the data collection for the intra-EU imports according to their needs. 3.Create an additional data source by making the exchange of micro data for intra-EU exports (dispatches) mandatory. 4.Member States can chose whether to use the exchanged data. A country specific, gradual implementation of the SIMSTAT system would be possible.
6
16.9.2014Nordic meeting6 The Benefits Potential for reduction in burden Quality maintained through additional data source Remove duplicate data collection Developing generic solutions for microdata exchange which can be used to support the wider ESS Vision
7
16.9.2014Nordic meeting7 The Costs Low cost solutions were made in the past The sharing of data is a new element, which will have –set-up costs (funding from Eurostat: ESSnet, Grants) –maintenance costs –additional costs for Member States –additional burden on Intra-EU exporters
8
16.9.2014Nordic meeting8 The Risks Will Member States realise this potential reduction? Will Member States use this new data set? will SIMSTAT deliver a burden reduction? will the burden reduction be sufficient? will the figures still be good enough quality and in time for National Accounts will there be consensus of the Council and of the European Parliament (for example on FRIBS)?
9
16.9.2014Nordic meeting9 Background clear, but what to do? Test the technical feasibility (ESSnet1+2) Pursue methodological considerations (ESSnet1+2, WG Methodology) Measure burden reduction potential (WG Methodology & Quality, SIMSTAT PTF and SG, BSDG) Evaluate the impact on quality (ESSnet1+2, WG Methodology & Quality, SIMSTAT PTF, SG of ITGS, BSDG) Draft legal text (WG Methodology, SG of ITGS, BSDG) Seek consensus (SIMSTAT PTF, SG of ITGS, BSDG, ESSC) -> Target timetable: trials analysis ready on Q4/2015? Final decisions during 2016?
10
Nordic meeting10 SIMSTAT-Pilot ESSnet1 timeline: 12 months, 27.9.2013 – 26.9.2014 Main tasks of the ESSnet1 1.Resolving the open technical issues for the practical micro-data exchange pilot 2.Elaboration of validation rules, data-exchange workflows, timetable et.c to be applied in the future ”production test”-environment 3.Planning of data compilation arrangements to be applied in the future ”production test” environment 4.Quality evaluation of the test results 16.9.2014
11
Nordic meeting11 Work plan: 1.WP1: Producing the technical documentation and instructions on technical issues (Krassimir Ivanov) 2.WP2: Setting up the confidentiality arrangements (Timo Koskimäki) 3.WP3: Establishing rules for validation and credibility checks, error correction and revision of data (Maria Serena Causo 4.WP4: Designing the production timetable for the trial tests (Rafael Mastrangelo) 5.WP5: Elaborating and implementing the data compilation guidelines (Olli-Pekka Penttilä) 6.WP6: Elaborating and implementing the quality evaluation of the test results (Søren Rich) All work will be based on work already done in PTF and Quality/Methods groups Solutions developed and adopted for testing, no “final” decisions to be made 16.9.2014
12
Nordic meeting12 Organisation of the work of ESSnet1 –Participating MSs: Austria, Bulgaria, Czech Republic, Denmark, Estonia, Germany, Greece, Italy, Luxemburg, Malta, Poland, Portugal, Romania, Slovakia, Finland (Co-ordinator), United Kingdom, France –One leading country for each work package –Most of the work to be done in-between the meetings –EUROSTAT expected to participate actively although it can not be reflected in the work plan
13
16.9.2014Nordic meeting13 ESSnet1
14
4 meetings: Kick-off meeting on 7th November in Luxembourg 2nd meeting on 22. – 23. January 2014 in Lisbon 3rd meeting on 7. – 8. May 2014 in Sofia Final 4th meeting on 10. – 11. September 2014 in Helsinki Nordic meeting1416.9.2014
15
WP1 tasks: Producing the technical documentation and instructions on technical issues for the exchange of micro-data during the ESSnet and future production-test environment 1.1. Elaboration of operational rules to be followed for those variables which are currently not collected by the countries participating in the trial test. This shall also include the operational rules for the simulation of the partner ID along the principle that was agreed in the PTF. (Draft February, Final 3 th meeting) 1.2. Definition and description of the dataset structure and detailed data exchange rules: “Doc Met 400 SIMSTAT” (data elements on 2 nd meeting, Draft document accepted by PTF February, Final on ESSnet 3 rd meeting) Nordic meeting1516.9.2014
16
Follow up the WP1 by Co-ordinator: DocMet400SIMSTAT: micro data file specifications (mandatory, monthly). New mandatory data elements: –“ID of partner trader”, “Country of origin in dispatches” Other data file: other data file specifications (voluntary, monthly) will include? –missing value estimates, below threshold trade estimates –the most important missing PSIs and estimate for that –confidential CN8’s monthly –data related to specific goods and movements –Intra-EU trade data coming from customs declaration Nordic meeting1616.9.2014
17
WP2 tasks: Setting up the confidentiality arrangements for the trial micro-data exchange 2.1. proposal for the contractual arrangements for the ESSnet data exchange and for the future production tests using the data transmission network (final on 2 nd meeting) 2.2. preparation of a draft contract template to be used in the context of the ESSnet and for the future production tests using the data transmission network (semi-final on 2 nd meeting, final on April 2014) 2.3. proposal for the practical organization of the micro-data exchange in the context of the ESSnet and signatures of the data exchange contracts (on 3 rd meeting) Nordic meeting1716.9.2014
18
Follow up the WP2 by Co-ordinator: Agreements signed (in force until end of 2017) between ESSnet1 participating MSs: –Multilateral agreement (all MSs exept France) –Bilateral agreement with France –CIRCABC folder for signed agreements (also for Trials, managed by Olli-Pekka Penttilä) Micro data exchanged between the 14 MSs on May- June 2014 Plan how new MSs will sign the agreements Nordic meeting1816.9.2014
19
WP3 tasks: Establishing rules for micro data validation and credibility checks, error correction and revision of data 3.1. Proposal for the rules to applied in the future production tests as part of data transmission network (draft on 2 nd meeting, final on 3 rd meeting) 3.2. Proposal for the rules to be applied in the MS’s IT systems/data validation processes prior to the transmission of the data and after receiving the data (draft on 2 nd meeting, final on 3 rd meeting) 3.3. Proposal for a workflow on how to sending and receiving MS deal with errors that the receiving MS detects in the delivered data (draft on 3 rd meeting, final on June PTF) 3.4. Testing of the feasibility of the proposed rules using the exchanged data as to reach a balance between error detection (data quality) and data validation/error correction burden for the MS’s (on 4 th meeting) Nordic meeting1916.9.2014
20
Follow up the WP3 by Co-ordinator: Rules for micro data validation and credibility checks and error correction done. Testing of the new rules will be done during trial tests. Nordic meeting2016.9.2014
21
WP4 tasks: Designing the production timetable for the trial tests adjusted to the production timetables of the MS’s and the current legal framework. The timetable should accommodate the impact of late responses and data corrections 4.1 Draft proposal for the production timetable with regard to the future “production test” context where data transmission network will be used. (final on 2 nd meeting) 4.2.Proposal for the timing and practices of data extractions and data exchange in ESSnet context in order to simulate the future “production test” timetable (draft on February 2014, final on 3 rd meeting) 4.3. Final proposal for the production timetable with regard to the future “production test” -context where data transmission network will be used including the impact of late response and data corrections (final on 4 th meeting) Nordic meeting2116.9.2014
22
Follow up the WP4 by Co-ordinator: 4 delivery dates during the month will be used to transfer micro data between the sending MS to the HUB for onward transfer to the receiving MS. The deadline for all MSs is t+30. The delivery of all monthly 2013(?) and 2014 data by the Member States to the HUB should be transferred either before the start of the trial or the data could be staggered during the trial test. The trial test expects participating Member States to transfer 2014 and 2015 Intrastat data according to the agreed timetable and file specification (DocMet400 SIMSTAT). Nordic meeting2216.9.2014
23
WP5 tasks: Elaborating and implementing the data compilation guidelines 5.1. Overview to national compilation practices (final on 2 nd meeting) 5.2 Proposal for the common practices to be applied for the data compilation during the ESSnet. (final on 3 rd meeting) 5.2 Proposal for the common practices to be applied for the data compilation in the future “production testing” environment. (final on 4 th meeting) Nordic meeting2316.9.2014
24
Follow up the WP5 by Co-ordinator: National test databases done for sending and receiving of micro data files Merging received other MSs Intra-EU exports and national Intra-EU imports data Invoice value will be analyzed Simulation of “ID of partner trader” if not collected Nordic meeting2416.9.2014
25
WP6 tasks: Elaborating and implementing the quality evaluation of the test results 6.1 Proposal for an analysis plan to evaluate the quality of the statistics to be produced during the ESSnet work. The plan should include both the production of short-term estimates and the production of detailed data. (draft on February-March 2014, final on 3 rd meeting) 6.2 Compilation and quality evaluation of statistics using the data exchanged during the ESSnet. Each participating MS should compile and analyze the data concerning their own economy obtained from other Member States. (reports August 2014, final on 4 th meeting) 6.3 Summary report on the results of the data analyses performed by all participating MS’s. (final on 4 th meeting) Nordic meeting2516.9.2014
26
Follow up the WP6 by Co-ordinator: Analysis plan has over 10 Excel spreadsheets. Only 10 MSs had time to do analysis during the summer, first time is the most burdensome. Summary report, first remark: –micro data from France and Italy with collected “ID of partner trader” has good quality. –other MSs has to simulate “ID of partner trader”, only CZ and GB successfully. Analysis plan for trial tests: process and product Nordic meeting2616.9.2014
27
Nordic meeting27 Next steps, the outline: The SIMSTAT project will prepare a report demonstrating the outcomes of the trial tests in 2015. The report will be presented to the ESSC in May 2016 for taking a decision on the eventual implementation of SIMSTAT. FRIBS will provide the legal basis for SIMSTAT if the ESSC decides to introduce a mandatory micro-data exchange in the area of intra-EU trade statistics.
28
16.9.2014Nordic meeting28 Next steps, detailed (1): Connect to CCN network (ready 10/2014) Grants 2014: IT, methodological issues (final 3/2015) ESSnet2 Co-ordinated by France (proposal 13.6.2014) : –Work package 1: Testing of functioning and the interoperability of the IT infrastructure and tools (final 3/2015) –Work package 2: Pilot micro-data exchange (4-9/2015) –Work package 3: assess the respect of validation and compilation rules for exchanged data and provide an improvement strategy (final 11/2015) –Work package 4: Analysis and documenting of trial results (final 12/2015)
29
16.9.2014Nordic meeting29 Next steps, detailed (2): SIMSTAT Trial test April - September 2015 FRIBS legislative drafting should be ready H1/2015 (final June 2015?) SIMSTAT ESSnet2 analysis of trial results 10-12/2015 (final December 2015) FRIBS legislative process 2016, FRIBS in force 2017 (or 2018?) EU-Grants 2016 or/and 2017: IT, methodological issues ??? 7 MS missing Trials? Connecting to CCN and testing 2016? Information to PSI’s (new data elements to be collected etc) on H2/2016? Total EU-testing (28 MSs) during 2017?
30
16.9.2014Nordic meeting30 Thank you! Discussion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.