Download presentation
Presentation is loading. Please wait.
Published byMargaretMargaret Maxwell Modified over 9 years ago
1
Report from ISRO 16th GSICS Executive Panel, Boulder, 15-16 May 2015 Pradeep Thapliyal Space Applications Centre (ISRO) India GSICS-EP-16, Boulder, 15-16 May 2015
2
INSAT-2E VHRR, CCD Indian Meteorological Geostationary Satellites 1999 INSAT-1D VHRR INSAT-2A/2B VHRR 1992/93 1990 KALPANA-1 VHRR 2002 2013 INSAT-3D Imager/ Sounder INSAT-3A VHRR, CCD 2003 2015 INSAT-3DR Imager/ Sounder 2016 GISAT MX-LWIR/MX-VNIR/ Hys-VNIR/Hys-SWIR
3
Participation in EP, GDWG, GRWG Points of contacts/meeting participants: – EP: Mr A S Kiran Kumar (chairman@isro.gov.in) – GDWG: Dr Pradeep Thapliyal (pkthapliyal@sac.isro.gov.in) – GRWG: Dr Pradeep Thapliyal (pkthapliyal@sac.isro.gov.in) Main contribution to GDWG actions – GSICS Website development (internal assessment) Main contribution to GRWG actions – Intercalibration procedure established for INSAT-3D Imager and Sounder – Sample products along with GPAF submitted to the GCC for evaluation, initial review report received and product is being modified for resubmission. – Diurnal variation in intercalibration using AIRS and IASI data. Comments, feedback – Participated in GRWG and GDWG meeting held in New Delhi during 16-20 Mar 2015. GSICS-EP-16, Boulder, 15-16 May 2015
4
ISRO GSICS website development GSICS-EP-16, Boulder, 15-16 May 2015
5
Current and prospective GSICS Products ProductStatusComments GEO-LEO-IRINSAT-3D / IASI intercalibration. Sample Demo Products submitted for review by GCC IASI-L1C data through Eumetcast has data gaps. Standing order setup with EUMETSAT Issues with the naming convention CCCC code (DEMS for IMD New Delhi) W_IN-ISRO-Ahmedabad,SATCAL+NRTC+GEOLEOIR,INSAT3D+IMAGER-MetopA+IASI_C_DEMS_20141002000000_demo_01.nc IASI L1C Data through Eumetcast – large data gaps leading to insufficient matchup points for NRTC products. Following discussions at GRWG/GDWG meeting in Delhi an arrangement has been made with EUMETSAT for IASI-L1C data over INSAT region through THREDDS server GSICS-EP-16, Boulder, 15-16 May 2015
6
Eumetcast data reception at Ahmedabad GSICS-EP-16, Boulder, 15-16 May 2015
7
Imager-WV vs IASI-A (Night, Dec 2014) Imager-MIR vs IASI-A (Night, Dec 2014) Imager-TIR1 vs IASI-A (Night, Dec 2014) Imager-TIR2 vs IASI-A (Night, Dec 2014) Sample Intercalibration Results: INSAT-3D Imager
8
GSICS-EP-16, Boulder, 15-16 May 2015 INSAT-3D Sounder Ch#3 Ch#6 Ch#8 Ch#10 Ch#13 Ch#6 SND
9
GSICS-EP-16, Boulder, 15-16 May 2015 Summary of ISRO GSICS Products GSICS recommended procedure adopted for INSAT-3D Imager/Sounder product. Presently only IR channels attempted VIS channels initiated using lunar calibration method. MODIS DCC database will be very helpful in implementing VIS/SWIR calibration. Same procedure will be adopted for Kalpana and INSAT-3A. Switching from EUMETCAST data reception to Standing order through Eumetsat GSICS THREDDS server. Archived data in the same format required to processing the past data Training: Short term for a Data Working Group scientist and long term for a Research Working Group scientist will greatly help in making GSICS products operational
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.