Download presentation
Presentation is loading. Please wait.
Published byMyra Marianna Washington Modified over 9 years ago
1
FORM 1075 – MECHANICAL INTEGRITY TEST
2
This presentation will assist you in the completion of the Form 1075. The mechanical integrity test. Date of Last Revision: 2009 Rule Requirement: OAC 165:10-5-6(d)(1) Explanation of Form: A pressure or monitoring test must be performed on new and existing enhanced recovery injection wells and disposal wells. Information must be submitted on Form 1075 and witnessed by a Field Inspector. Forms shall be submitted to the Conservation Division's Underground Injection Control Department. [Reference 165:10-5-6] Question concerning this Form: For more information contact Underground Injection Control at (405) 522-2764.
3
FORM 1075 – MECHANICAL INTEGRITY TEST DATE OF THE TEST
4
FORM 1075 – MECHANICAL INTEGRITY TEST OPERATOR’S NAME
5
FORM 1075 – MECHANICAL INTEGRITY TEST OTC/OCC OPERATOR NUMBER
6
FORM 1075 – MECHANICAL INTEGRITY TEST MAILING ADDRESS, PHONE NUMBER, CITY, STATE, ZIP CODE AND FAX NUMBER OF THE OPERATOR
7
FORM 1075 – MECHANICAL INTEGRITY TEST TYPE OF TEST: - INITIAL TEST - RETREST - CHANGE OF OPERATOR
8
FORM 1075 – MECHANICAL INTEGRITY TEST TYPE OF WELL – - COMMERICAL DISPOSAL - NON-COMMERICAL DISPOSAL - INJECTION
9
FORM 1075 – MECHANICAL INTEGRITY TEST AUTHORIZING OCC ORDER NUMBER
10
FORM 1075 – MECHANICAL INTEGRITY TEST ADDITIONAL ORDER NUMBERS
11
FORM 1075 – MECHANICAL INTEGRITY TEST WELL NAME AND NUMBER
12
FORM 1075 – MECHANICAL INTEGRITY TEST API NUMBER
13
FORM 1075 – MECHANICAL INTEGRITY TEST LATITUDE AND LONGITUDE
14
FORM 1075 – MECHANICAL INTEGRITY TEST LOCATION OF THE WELL – - QUARTER SECTION CALLS - SECTION - TOWNSHIP - RANGE - COUNTY
15
FORM 1075 – MECHANICAL INTEGRITY TEST UNIT NAME AND UNIT ORDER NUMBER
16
FORM 1075 – MECHANICAL INTEGRITY TEST REWORK PRIOR TO TEST? PLEASE ATTACH A COPY OF AN EXPLANATION IF MORE SPACE IS REQUIRED
17
FORM 1075 – MECHANICAL INTEGRITY TEST PRESSURE TEST - PASS - FAIL
18
FORM 1075 – MECHANICAL INTEGRITY TEST CASING/TUBULAR ANNULUS TESTED?
19
FORM 1075 – MECHANICAL INTEGRITY TEST SURFACE CASING PRESSURE BEFORE TEST
20
FORM 1075 – MECHANICAL INTEGRITY TEST TUBULAR PRESSURE BEFORE TEST
21
FORM 1075 – MECHANICAL INTEGRITY TEST ANNULUS PRESSURE BEFORE TEST
22
FORM 1075 – MECHANICAL INTEGRITY TEST FLOW-BACK VOLUME
23
FORM 1075 – MECHANICAL INTEGRITY TEST MAXIMUM PRESSURE PER OCC ORDER
24
FORM 1075 – MECHANICAL INTEGRITY TEST PACKER DEPTH PER OCC ORDER
25
FORM 1075 – MECHANICAL INTEGRITY TEST ACTUAL PACKER DEPTH
26
FORM 1075 – MECHANICAL INTEGRITY TEST ESTIMATED PACKER DEPTH
27
FORM 1075 – MECHANICAL INTEGRITY TEST STARTING TEST PRESSURE
28
FORM 1075 – MECHANICAL INTEGRITY TEST ENDING TEST PRESSURE
29
FORM 1075 – MECHANICAL INTEGRITY TEST POSITIVE ANNULUS PRESSURE MONITORING?
30
FORM 1075 – MECHANICAL INTEGRITY TEST IS THE WELL SHUT DOWN? - YES (GIVE REASON) - NO
31
FORM 1075 – MECHANICAL INTEGRITY TEST ALTERNATIVE TESTING PROCEDURE AUTHORIZED BY OCC ORDER NUMBER
32
FORM 1075 – MECHANICAL INTEGRITY TEST PASS / FAIL - TRACER SURVEY - FLUID LEVEL - TUBING PRESSURE - FLUID DEPRESSION
33
FORM 1075 – MECHANICAL INTEGRITY TEST CASING PATCHED OR SQUEEZED
34
FORM 1075 – MECHANICAL INTEGRITY TEST IF YES TO CASING PATCHED OR SQUEEZED INDICATE TYPE - MECHANICAL CASING PATCH - CEMENT SQUEEZE - REMEDIAL FLUID - PROVIDE A DESCRIPTION
35
FORM 1075 – MECHANICAL INTEGRITY TEST PRINTED NAME OF PERSON DOING THE TEST
36
FORM 1075 – MECHANICAL INTEGRITY TEST SIGNATURE OF COMPANY REPRESENTATIVE
37
FORM 1075 – MECHANICAL INTEGRITY TEST WITNESS STATEMENT BY OCC FIELD INSPECTOR
38
FORM 1075 – MECHANICAL INTEGRITY TEST SIGNATURE BLOCK OF OCC FIELD INSPECTOR
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.