Download presentation
Presentation is loading. Please wait.
Published byJewel Barton Modified over 9 years ago
4
At 10:15 AM they managed to shut down the entire system.
6
What would be the impact in your organization?
13
Manage the full stack
14
TFS Drop Location RM DesktopRM Web QADEV RM Server
15
Assumed State Start with an Assumption of target Environment Run a series of actions Desired State End with desired state (hopefully) Send a description of the desired state DSC capability reaches the desired state Get.Test.Set “Make it so” DSC Resources TFS Config as Code Shared Gallery
16
Chef Development Kit Cookbook and Policy Authoring Test-Driven Infrastructure Chef Server Management Console Analytics Platform High Availability and Replication Chef Client Nodes Data Center The Cloud
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.