1 Full cryogenic operation of AMTF – the first year
6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting the work of many colleagues: IFJ-PAN (Poland) WUT(Poland),BINP(Russia), Linde/Cofely and several DESY groups How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row. 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

2 6th International Workshop on Cryogenics Operations
Outline AMTF - purpose & objectives (TDR) AMTF – layout AMTF- main cryogenic components Refrigerator availability Main cryo operation problems General safety requirements Cryogenic safety Safety of work organisation Some preliminary test results for XFEL cavities & modules (Preliminary) conclusions 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

3 AMTF: purpose & objectives (TDR)
- Complete cold performance test of all XFEL cryomodules before tunnel installation (RF, vacuum,cryo-losses) 103 cryomodules, rate: 1/week - Cold RF test of all XFEL superconducting cavities before cryomodule assembly 824 cavities, rate 6/week - Cold test of all superconducting magnet packages before cryomodule assembly 103 magnets, 1/week - ( Assembly and tests of RF Waveguides (WP1) at Waveguide Assembly and Test Facility WATF) Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

4 6th International Workshop on Cryogenics Operations
AMTF layout (TDR) 84m x 48m Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View Three test benches (XATB1, XATB2 and XATB3) for testing assembled modules and for high power tests of assembled cavities Two test cryostats (XATC1 and XATC2) for RF performance tests of the cavities (One magnet test stand XMTS (located in the Magnet Test Hall Building 55) for testing magnets) 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

5 6th International Workshop on Cryogenics Operations
AMTF Hall - Cavity Vertical Cryostat Radiation protection shielding Cavity preparation area Cavity storage area Cavity incoming check area Clean room 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

6 6th International Workshop on Cryogenics Operations
AMTF Hall - Cryomodule Unloading of the cryomodule after transport Cryomodule preparation area Cryomodule test stand Cryomodule test stand – module inside Cryomodule test stand – front view 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

7 XMTS: Test stand for sc XFEL Quadrupoles
Formal part of AMTF but installed and in operation since July 2008 Status November 2014: 96 (of 103) Quadrupols tested For the development and series tests of superconducting magnet packages & current leads (in MTH-bldg 55) 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

8 Cryogenic operation of AMTF
AMTF is supplied by the FLASH-Helium-Refrigerator (former refrigerator 42 of the HERA plant) For the operation of the AMTF 3 KW at 40/80K, 0.5 KW at 4.5K and a peak liquifaction rate of 33 g/s have to be delivered. The peak liquifaction is buffered by means of a 1oooo ltr liquid helium storage dewar (XAST.) Capacity limit: return gas peak screw compressor capacity during cool down/warm-up 2 dynamic procedures in parallel 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

9 AMTF – cryogenics contributions
Red = WUT Wroclaw University of Technology -> Kriosystem Blue = DESY MKS Acting for XFEL company (no in-kind !) -> DEMACO Green= BINP Budker Institute Novosibirsk 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

10 AMTF components (utilities etc./DESY in-kind)
Pump station – completed in September 2010 Compressor station – completed in August 2010 Control building – completed in October 2010 Test Hall – erected in May 2010 Piping bridge – completed in October 2010 Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

11 6th International Workshop on Cryogenics Operations
Transfer line XATL1 The ~170m long DN400 transfer line XATL1 supplies the test stands with cryogenic power from HERA refrigerator. WUT/Poland in-kind. Spec DESY: Short specification in August 2008 Full specification in August 2009 Commissioning August 2012 – in continuous operation since December 2012 Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View DESY (in-kind): Valve box for XATL1 at refrigerator 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

12 Helium compressors (DESY in-kind)
2 sets of compressors for 2K operation at AMTF ( 2 x 20 g/s helium at 20 mbar) 1 set = 13 x parallel (WS 2001 RUVAC roots blower + SOGEVAC SV750B ) – simple, (robust), modular, redundant Manifacturer: Oerlikon Leybold SOGEVAC: 4 unscheduled repairs, complete replacement of bearings & packing rings (all SOGEVAC) RUVAC: 4 repairs, complete exchange of bearings ongoing (all RUVAC) RUVAC No impact for AMTF operation Very reliable service & support from manufacturer SOGEVAC In average: about 5000 h operation (status November 2014) 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

13 AMTF Vertical Cryostats
SPEC DESY April 2009 Design & Construction WUT&Kriosystem Poland in-kind Delivery & installation: July 2012 – April 2013 Cavity Frame Design: DESY FLA 6 inserts for AMTF 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

14 AMTF: 3 cryomodule test stands & cryostat adapters
Spec DESY (February 2010) Design, Construction, Installation: BINP in-kind First test stand delivered & installed May 2013 (cold commissioning July 2013) Cold commissioning of 3rd test stand December 2013 2 cryostat adapters for the test of single dressed cavities at AMTF 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

15 6th International Workshop on Cryogenics Operations
XAST,XAVB, XAVB DESY is acting for the XFEL company Manufacturer: DEMACO NL Wessington Cryogenics Ltd UK L Helium Dewar XAST Sub Cooler Box XASB Valve Box XAVB 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

16 Cool down and Warm up XATC1, XATC2 XATB1, XATB2, XATB3
Pump and purge manual Cool-down to 4K, liquid helium transfer and warm-up process automatized by use of SNL scripts Pump-down to 2K manual XATB1, XATB2, XATB3 Pump and purge manual Complete cool-down and warm-up process performed manually by cryo-operators Pump and purge Pump and purge Cool-down to 4K, helium liquefaction Cool-down to 100K Liquid helium transfer to the cryostat Pump-down to 2K Cool-down to 70K Pump-down to 2K Measurement at 2K Measurement at 2K Warm-up to 300K Liquid helium transfer from the cryostat Pressure rise to 1 Bar Warm-up to 300K Liquid helium evaporation Pressure rise to 1 Bar Cryogenics operation sequence for vertical cryostat Cryogenics operation sequence for cryomodule test stand 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

17 Vertical Cryostats Operation Cycles
Example: July > September 2014 About 180 cycles since start of AMTF operation in 2013 Courtesy of J.Zajac Linde/Cofely 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

18 XFEL Cryomodule tests operation Cycles
About 20 cycles since September 2013 (now 13th XFEL cryomodule under test) Courtesy of J.Zajac Linde/Cofely 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

19 Refrigerator Avialability 2013
Courtesy of J.Zajac Linde/Cofely 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

20 Refrigerator Avialability 2014
Courtesy of J.Zajac Linde/Cofely 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

21 Main Cryo Operation Problems in AMTF
Mixing of serial tests with installation work and commissioning Problems with warm 2K helium compressors (see transparency) Mixing of warm&cold gas for controlled cool-down/warm up LHe level measurements affected by electrical heaters 2K supply JT-valve in module test stand 3 (XATB3) out of shape Misalignment of process tube flanges (feed-caps) -> adapters ‚Digital‘ operation of valve positioners -> change type of positioners Thermal contact of electrical heaters -> use of ‚CMTB-type‘ heaters Liquid level measurements -> increase current Mix-up of thermometers (calibration) -> try to sort, some re- calibration -> Several problems with well known and ‚mature‘ components ! 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

22 Cryogenic safety no general risk of oxygen deficiency within the AMTF hall (about m3 volume) oxygen deficiency monitors in each module test stand radiation protection cave design of helium safety valves and venting systems according to our cryomodule ‚crash-tests‘ on CMTB or – on default- according to ‚Lehmann-Zahn‘ values 5K and 40/80K helium release systems separated from 2K release systems (20 bar vs. 4 bar) all safety valves vent into helium volumes – venting to atmosphere outside the hall Oxygen monitor 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

23 AMTF: general design & safety requirements
EU/German law ‚Betriebssicherheitsverordnung‘ DESY safety rules Rules&procedures for buildings & utilities General safety & radiation safety rules Pressure vessels: PED (AD2000,EU harmonized code) This means in advance of technical commissioning: Third party interlock approvals PVI(=appoval before operation) by third party (the complete procedure took several months for AMTF) … (list is not complete) 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

24 AMTF safety at work - organisation
Safety officers for different working areas Electronic access control for AMTF (‚DACHS‘) Safety instructions checked by electronic access control (general safety, cryogenic safety, radiation safety) ‚DACHS‘ electronic access control 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

25 Vertical acceptance tests
25 Vertical acceptance tests Analysis of vertical acceptance tests includes Series Cavities + “ILC HiGrade”-Cavities NO infrastructure commissioning tests So far delivered: 488 cavities (status November 2014) Total RF tested: 450 cavities Manufacturer 1 Manufacturer 2 Average: > 9 tests per week since Oct (full operation of AMTF) Status of plot: July 2014 Courtesy of J.Swierblewski IFJ-PAN details see LINAC 2014 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

26 Yield of gradients: “As received”
26 Yield of gradients: “As received” Yield of usable and maximum gradient of 339 cavities “as received” M1 M1 M2 M2 Average maximum gradient: (30.4 ± 7.6) MV/m M1: (28.4 ± 7.1) MV/m M2: (32.4 ± 7.6) MV/m Average usable gradient: (26.6 ± 7.6) MV/m M1: (24.8 ± 7.0) MV/m M2: (28.6 ± 7.9) MV/m given errors are standard deviation Courtesy of J.Swierblewski IFJ-PAN details see LINAC 2014 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

27 Summary of preliminary module results
27 Summary of preliminary module results Status November 2014: XM13 is under test, 18 modules at DESY average max. gradient module [MV/m] average max. gradient vertical [MV/m] Average operational gradient module [MV/m] Average usable gradient vertical [MV/m] XM-2 27.2 28.1 24.5 26.5 XM-1 28.2 30.8 25.1 29.4 XM1 30.3 32.5 27.6 29 XM2 27.7 32.7 25.5 28.6 XM3 30.4 32.0 28.8 29.3 XM4 33.3 23.8 30.5 XM5 27.8 28.9 24.9 26.9 Courtesy of J.Swierblewski IFJ-PAN details see LINAC 2014 All results above XFEL specs MV/m 6th International Workshop on Cryogenics Operations Bernd Petersen DESY

28 Some (preliminary) conclusions
Deliveries & installation of XATCs,XATB,XAVB,XATL were ‚just-in-time‘ for start-up of cavity production Deliveries & installation of XATBs were ‚just-in-time‘ for start-up of cryomodule production No dedicated de-bugging of cryo-supply (and other systems) XATCs design capacities demonstrated Complexity of XATBs commissioning underestimated General effort for installation & commissioning underestimated To be demonstrated: 1 cryomodule test/week So far: in budget and almost ‚in time‘ (not ‚on schedule‘) Thank you for your attention ! 6th International Workshop on Cryogenics Operations Bernd Petersen DESY