Download presentation
Presentation is loading. Please wait.
Published bySabina Crawford Modified over 9 years ago
1
Improvement-1
2
Continuous Improvement Check Do Act Plan Time Quality level Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin
3
Improvement-3 Lead a Plan-Do-Check-Act (PDCA) process improvement initiative. Use quality tools for analysis and problem solving. Compare and contrast the corporate programs for quality improvement. Learning Objectives
4
Improvement-4 Foundations of Continuous Improvement - Customer Satisfaction - Management by Facts - Respect for People Plan-Do-Check-Act (PDCA) Cycle Problem Solving (10 steps) Quality and Productivity Improvement Process
5
Improvement-5 Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
6
Improvement-6 Check Sheet
7
Improvement-7 Run Chart
8
Improvement-8 Histogram of Lost Luggage
9
Improvement-9 EquipmentPersonnel Procedure Materia l Other Aircraft late to gate Late arrival Gate occupied Mechanical failures Late pushback tug Weather Air traffic Late food service Late fuel Late baggage to aircraft Gate agents cannot process passengers quickly enough Too few agents Agents undertrained Agents undermotivated Agents arrive at gate late Late cabin cleaners Late or unavailable cockpit crews Late or unavailable cabin crews Poor announcement of departures Weight and balance sheet late Delayed checkin procedure Confused seat selection Passengers bypass checkin counter Checking oversize baggage Issuance of boarding pass Acceptance of late passengers Cutoff too close to departure time Desire to protect late passengers Desire to help company’s income Poor gate locations Delayed Flight Departure Cause-and-Effect Chart for Flight Departure Delay (Fishbone Chart)
10
Improvement-10 Pareto Analysis of Flight Departure Delay Causes
11
Improvement-11 Flowchart
12
Improvement-12 Scatter Diagram
13
Improvement-13 expected Lower Control Limit 19981999 Control Chart of Departure Delays
14
Improvement-14 Marriott Personnel Programs Zero Defects (Crosby) Deming’s 14 Point Program Malcolm Baldrige Quality Award ISO 9000 Six-Sigma Corporate Programs for Quality Improvement
15
Improvement-15 Mega Bytes Restaurant 1.How is the Seven-Step Method (SSM) different from Deming’s PDCA cycle? 2.Prepare a cause-and-effect or fishbone diagram for a problem such as “Why customers have long waits for coffee.” Use Figure 6.30 as a guide. 3.How would you resolve the difficulties that study teams have experienced when applying the SSM?
16
Improvement-16 The Seven-Step Method Step 1: Define the project Step 2: Study the current situation Step 3: Analyze the potential causes Step 4: Implement a solution Step 5: Check the results Step 6: Standardize the improvement Step 7: Establish future plans
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.