Check list ISM Code DOC
2
ISM Code Certification
Document to be used for reporting the audit of the company ( DOC ) Company Type of audit : Initial Periodical Renewal Additional DOC issued on : Ship’s types cover by the DOC : Expiring date : N° Department audited Contacted person and position 1 2 3 4 Conclusions of the audit : Individual non-conformity report must be attached to this document Report N° Place : Date : Auditor name and signature :
3
ISM Code Certification
Document to be used for reporting the audit of the company ( DOC ) 1) Status of the pending non-conformity (ies) 2) New Non-conformity (ies) issued during the present audit 3) Suggestions from auditees to improve the SMS
4
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 1 Objectives The objectives of the ISM C ode and SMS are understood by the management and key personnel 2 Safety & Environmental Policy The health, safety & environmental protection policies are signed by the company’s chief executive or other senior executive officer The safety & environmental protection policies are reviewed at regular intervals The safety & environmental protection policies are posted in the offices All ships of the fleet have been involved
5
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 3 Company Responsibilities and Authority The owner has reported to the Administration and to the Society the entity responsible for the operation of the ships The Administration has been provided with the name, address, telephone, fax and telex numbers of the company Responsibility, authority and interrelation of key persons managing, performing and verifying work relating and affecting the SMS are defined and documented An updated company organizational chart is available The updated telephone numbers of the DPA(s) and their back up are available to the interested persons ashore and on board The following activities are subcontracted to : (use bottom part of this page if necessary) The company maintains the subcontracted activities under control ( specify the system adopted - use bottom part of this page if necessary ) Responsibility and authority of masters, chief engineers and other shipboard key persons are defined and documented A procedure has been established to provide the DPA(s) the possibility to ask for resources and shore based support to the company’s management
6
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 4 Designated person (s) - DPA There are designated by : And the number of them are : (use bottom part of this page if necessary) The DPA (s) belong to the company staff The organization of the company ensure direct assess to the highest management level The continuous availability of the DPA (s) is ensured The results of safety and antipollution audits and inspections are reported to the DPA (s) Requests from ships for resources and shore based support are supervised by the DPA (s)s
7
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 5 Master’s Responsibility and authority The master’s role in the implementation of the safety and environmental protection policy of the company is clearly defined The elements of IMO resolution A.443 (XI) are incorporated in the SMS The policy is correctly implemented (provisions of the SMS are followed) Documentation of the specific duties delegated to the officers under the master’s command are provided to the master by the company Appropriate orders and instructions are issued (standing orders, night orders, etc) The master reviews the SMS and reports to the company any deficiency ( e.g. the review is made during safety meetings) The company shore based management system allows for the master’s overriding authority and responsibility The crew is motivated ( e.g. by the means of meetings with the crew, instruction of the crewmembers at embarkation, etc)
8
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 6 Resources & Personnel Crew is selected by the company/by the manning agent………. Criteria are fixed to ensure that seafarers are qualified (STCW) and medically fit periodically and at embarkation Ship’s officers are employees of the company Ship’s crew are employees of the company Information, appraisal and qualification records of shipboard personnel are available Each person employed on board is in possession of a medical examination certificate attesting the medical fitness for duty (place of examination and validity no more than two years) Drug and alcohol tests file is provided Performance bonus to the shipboard personnel has been assigned last year Vessel and duties introduction and familiarization training is Accordance with section A-I/6 of the STCW Code for on-coming officers and crew are documented Familiarization procedures exist (e.g. overlapping, tutorial training, written handing over procedures, briefing at embarkation,….. concerning safety and operational aspects Adequate understanding of rules & codes for the personnel involved in the SMS is ensured. Any training required is identified Senior officers read and understand the SMS manual and other communications from the company Shipboard working language has been established ( knowledge of English is required for senior officers)
9
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 7 Development of Pans for Shipboard operation A procedure exists for the preparation of plans and instructions for keyboard operations A master’s port arrival/departure safety check list incorporating pre-established company policy guidelines for go/no go situations and reporting requirements for the master is included in the SMS 8 Emergency preparedness The emergency plans are periodically reviewed, updated and amended The emergency plans are approved by the Administration The identification of the emergency situations is made from previous experience and from analysis of accidents and near misses The maritime regulation requirement for weekly emergency drills and training sessions as well as for lowering of each lifeboat to the water every 3 months are complied with SOPE (or VRP) approved plans are available for each ship (company contact is always available, office organization is foreseen)
10
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 9 Report & Analysis of Non-conformities, Accidents & Hazardous Occurrences Procedures exist for the reporting & analysis of Non-conformities, Accidents & Hazardous Occurrences Procedures exist for the implementation of corrective action (e.g. request of corrective action from company with copy to DPA and verification during the next internal audit) Procedures exist for immediately reporting Port State detention to the Administration The communication and reporting procedures specified in the SMS documents have been adopted Communications and reports are filed The following ships had accidents or occurred in hazardous situations since the previous audit :
11
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 10 Maintenance of the Ship and Equipment The maintenance system includes systematic plans and actions designed to address all those items and systems covered by class and statutory survey Records of inspections and maintenance are available. Communications from ships concerning the implementation of corrective action are filed Intervals for maintenance and inspections are established and observed Periodic functional tests of the stand-by arrangements, equipment and systems that are not in continuous use are carried out Communication is given to the concerned DPA of non-conformities with possible causes Evaluation is made if corrective action is to be taken by the crew or if support from shore is needed Date of last company’s inspections to the ships Ship name : Date :
12
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 11 Documentation The updated SMS documents ( SMS manual, Company manual and Circular letters) are available as specified by the relevant distribution list Periodic verification of the documents kept in files is foressen Obsolete documents are disposed of A list of valid circular letters is available Mandatory rules, regulations and the relevant list are available Applicable codes, guidelines, standards and the relevant list are available The IMO resolution A.443(XI)- Decision of the shipmasters with regard to Maritime Safety and Marine Environmental Protection- is available The IMO resolution A.742(18)- Procedures for the control of Operational Requirements related to the Safety of ships and Pollution Prevention- is available The following documents and relevant index are available: Manual, drawings & user’s manuals. Manuals, documents & Instructions requested by compulsory requirements The following records are maintained and properly filed: Master/chief engineer reports at signing off, Inspection and maintenance reports Fuel and lube oil analysis reports Spare parts and material supply Work list Correspondence with ships Ship’s certificates are in due course of validity (have been examined) Ship name : Date :
13
ISM Code Certification
Check list to be used during the audit of the company ( DOC ). This document must be attached to the report. Par. of the code Element of the ISM Code Department audited Rem. N° 1 2 3 4 12 Company Verification, Review and Evaluation Internal audits are conducted by the company at least annually on each department as well as on each vessel to verify compliance of the SMS to the stated objectives of the ISM Code The auditors belong to the company’s staff or to an external organization The audit report is handed over to the person responsible for the area involved The responsible of the area involved, when the agreed corrective actions are implemented, communicates it to the auditor The audits are performed on the basis of a check list Both for the audit report and for requiring corrective action, appropriate forms are foreseen A review of the adequacy of the SMS is carried out annually by the company management. The minutes of the review meeting are available Date of the last office’s audit Department : Date : Date of the last ship’s audit Ship : Date :