Download presentation
Presentation is loading. Please wait.
Published byMelvyn Chambers Modified over 9 years ago
1
LEPL - TECHNOLOGY DEVELOPMENT FUND (TDF) 2015
2
LEPL – TECHNOLOGY DEVELOPMENT FUND Vision: The vision of the Fund is to present Tbilisi to the international society, as a regional center for innovations and modern technologies in terms of municipal services and products. Mission: The mission of the Fund is to implement innovative modern technologies and products in the municipal services provided by Tbilisi self-government.
3
3 GOALS Innovations and technology development; Professional enhancement (Capacity Building) Development of modern municipal infrastructure of Tbilisi
4
CURRENT SITUATION Before and After October 2014
5
Since Change Management in October 2014 Implemented and Current Projects: Founded in 2011. Total number of employees 67. Short Term Strategy (3 years) was prepared based on the analysis of the current situation 22 Innovative Projects were prepared and are under the implementation process Project of Tbilisi Dinamo Rehabilitation project was prepared and is under implementation process (Budget: 2014 -2015 13 ML. GEL) Process of developing infrastructure for Digomi Olympic Complex is underway (2014 -2015 12.7 ML GEL) Project of Ropeways (Republic Square – Mtatsminda) is being implemented (2014 -2015 3.5 ML GEL)
6
SWOT Analysis has been done towards potential partner educational establishments. More then 15 new initiatives are going through projection phase New PR Strategy is being implemented Horizontal Managing system was created to manage projects more effectively Activities Since October 2014
7
Implementation period 2015-2016 Budget (2 years ): GEL 1 623 000 ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM INTEGRATION at TBILISI CITY HALL 7 The main results of the “project management system” is to make: Consolidation and analysis of database related to current and future projects; Trainings in project management system; Integration of the software.
8
Web-Platform- milionikhe.gov.ge (web application for planting a million tree) Traffic application; Implementation period : 2015 Budget : GEL 86 000 8 IT Laboratory
9
Creating QR Library (e-books) Public Spaces Tbilisi Metro Implementation period : 2015 Budget: GEL 35 200 9 QR Library
10
The project focuses on civic engagement in decision-making and budgeting process of the City through innovative ideas to solve existing problems and facilitate city development - via web-application, presentations and through direct meetings with City Hall top-managers. Implementation period : 2015-2017 Budget ( 3 years ) : GEL 115 000 10 CITY FORUM: LET’S TAKE CARE OF Tbilisi together
11
The goal of the project is to select one of the streets of Tbilisi and design it with special “green” status Planting specially selected trees; Make green infrastructure on the street (façade, walkways, solar battery street lighting etc.); Installing digital technological information devices for measurement of air pollution level. Implementation period : 2015 Budget : GEL 765 000 11 TBILISI GREEN STREET
12
The project is pilot and includes: Power-efficient thermal insulation of building; Installation of power-efficient, modern heating and water-delivery systems; Installation of power-efficient lighting system. Implementation period : 2015 Budget: GEL 182 300 12 ENERGY EFFICIENT MUNICIPAL BUILDING
13
Best Practice and experience Sharing with Sister and Partner Cities Live TV Bridge with partner cities Implementation period: 2015 -2017 Budget ( 3 years ): GEL 231 000 SISTER AND PARTNER CITIES 13
14
Conducting Feasibility Study According to Feasibility Study Report – creating pilot project Implementation period: 2015 Budget: 2 910 000 GEL 14 TBILISI Cycling Path
15
Feasibility Study Conducting Study or current Situation Forming the strategy and concept of the project Experience Sharing from EU States Implementation period: 2015 Budget 80 000 GEL 15 Public Transport Sound Information System and Tactile Paving for Visually Impaired and Sightless Persons
16
Forming academic space Members of the cluster will be European, American and Caucasian Universities The main objective is development of Tbilisi City. Implementation period : 2015-2017 Budget : GEL 43 000 16 TBILISI UNIVERSITY CLUSTER
17
Establishment of consulting group with technological-innovative profile; Evaluation of innovative ideas and projects; Specification of different competition conditions towards innovations and technologies Implementation period : 2015 Budget: GEL 12 000 17 CONSULTING TECHNOLOGY GROUP
18
Establishment of FabLab and business incubator; Annual technological-innovative competition for start-up projects - Idea Challenge Implementation period : 2015-2017 Budget ( 3 years ) : GEL 600 000 18 BUSINESS INCUBATOR - IDEA CHALLENGE
19
Formation of group of experienced lawyers and economists, which based of EU-Georgia Association Agreement will provide qualified consultations to Tbilisi City Hall and its departments. Implementation period : 2015-2017 Budget ( 3 years ) : GEL 523 000 19 EU-GEORGIA ASSOCIATION AGREEMENT CONSULTING GROUP
20
Conducting Training Needs Analysis (TNA) for a short-term vocational educational trainings for Tbilisi self-government employees; Training courses for Tbilisi City Hall employees according to the TNA. Implementation period : 2015-2017. Budget (3 years) : GEL 96,968 20 TRAININGS FOR TBILISI SELF-GOVERNMENT EMPLOYEES
21
Training Courses for final year students to improve soft skills for future successful employment. Implementation period : 2015-2017. Budget (3 years) : GEL 76 800. 21 PROFESSIONAL WORLD
22
Training courses for Tbilisi City Hall employees Computer Science English language Implementation period : 2015-2017 Budget (3 years): GEL 140,000 22 TEACHING OF TBILISI CITY HALL EMPLOYEES SECTORAL COMPUTER PROGRAMS AND BUSINESS- TECHNICAL ENGLISH LANGUAGE
23
The project consists of 3 parts: Feasibility Study of Tbilisi Ropeways Projecting of Vazi subani-Samgori route ropeway ; To build Mtatsmina – Redison Ropeway; Implementation period: 2015 Budget : GEL 4 0 06 000 TBILISI ROPEWAYS 23
24
Installing new turnstiles Changing seats New Sound system installation Installing Video surveillance cameras (CCTV) Installing 52 projectors Scoreboard replacement; New 6 km Cable installation; Reconstruction of first tier Implementation period : 2015 Budget : 19 000 000 GEL D DINAMO REHABILITATION PROJECT
25
Construction of motor road and pedestrian trails Construction of electric power station units Construction of Sewage System Water and sewage and drainage works Building Supporting walls, ramps and stairs Dendrology and irrigation system works Implementation period : 2014-2015. Budget : 12 675 840 Gel. ` DIGOMI OLYMPIC SPORT COMPLEX
26
The aim of the project is to invite expert of Dutch organization PUM with the experience in innovations and new technologies: The expert will help the Fund in searching of new donors within the Europe; The expert will consult the Fund regarding institutional development; Implementation period : 2015. Budget: GEL 1900. 26 PUM NETHERLANDS SENIOR EXPERTS
27
Implementation of Quality management ISO 9001:2008 system in TDF Implementation period : 2015 Budget: GEL 22 000 27 INTRODUCTION OF ISO 9001:2008 SYSTEM IN TDF
28
28 BUDGET OF TDF 27 621 671.95 GEL – 2015 YEAR 41 781 997.95 GEL- 2015-2017 (3 Year Period )
29
THANK YOU!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.