Download presentation
Presentation is loading. Please wait.
Published byJodie Atkins Modified over 9 years ago
1
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014
2
ESSIP Plan 2014 / Objective COM112 Objective COM11 Comprehensive Explanation Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2013 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts
3
ESSIP Plan 2014 / Objective COM113 Comprehensive Explanation The initiative covers inter centre (encompassing all type of ATM Units) voice communication and the links with the ground radio Stations; The objective forecasts that all ECAC States migrate their ATM voice services to VoIP by the specified Full Operational Capability 12/2020; Initial Operational Capability (Forward fit) date is 01/2013 for both inter- centre telephony and the links to the ground radio stations on the ground segment of the Air-Ground voice. Inter centres voice communications are currently mainly performed via analogue and partially digital circuits (ATS-QSIG) since 2003. At present VoIP is identified as being the medium term standard for ground telephony and ground segment of the Air-Ground voice.
4
ESSIP Plan 2014 / Objective COM114 Link to European ATM Master Plan Digital Voice/VoIP for ground telephony CTE-C8CTE-C8
5
ESSIP Plan 2014 / Objective COM115 Most important SLoA(s) COM11-ASP03 Upgrade and put into service Voice Communication Systems to support VoIP inter-centre telephony (12/2020) COM11-ASP04 Upgrade and put into service Voice Communication Systems to support VoIP links to the ground radio stations (12/2020)
6
ESSIP Plan 2014 / Objective COM116 Finalisation Criteria and Closed Questions Voice communications systems have been upgraded; The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA); Upgraded voice communication systems have been put into service
7
ESSIP Plan 2014 / Objective COM117 Regulation and Supporting Material EUROCONTROL - ESARR 4 Risk Assessment and Mitigation in ATM EUROCONTROL - ESARR 4 Risk Assessment and Mitigation in ATM EUROCAE - ED-136 - Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) System Operational and Technical Requirements 02/2009; EUROCAE - ED-136 - Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) System Operational and Technical Requirements 02/2009 EUROCAE - ED-137B - Interoperability Standards for VoIP ATM Components (Volume 1: Radio - Volume 2: Telephone - Volume 3: European Legacy Telephone Interworking - Volume 4: Recording - Volume 5: Supervision) 01/2012; EUROCAE - ED-137B - Interoperability Standards for VoIP ATM Components (Volume 1: Radio - Volume 2: Telephone - Volume 3: European Legacy Telephone Interworking - Volume 4: Recording - Volume 5: Supervision) 01/2012 EUROCAE - ED-138 - Network Requirements and Performances for Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) Systems (Part 1: Network Specification – Part 2: Network Design Guideline) - 28.02.2009; EUROCAE - ED-138 - Network Requirements and Performances for Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) Systems (Part 1: Network Specification – Part 2: Network Design Guideline) - 28.02.2009 EUROCONTROL - SIP v ATS-QSIG Gateway Interworking Test Specification - Edition 2 / 12/2013; EUROCONTROL - SIP v ATS-QSIG Gateway Interworking Test Specification - Edition 2 / 12/2013 EUROCONTROL - SIP v ATS-R2 Gateway Interworking Test Specification - Edition 2 / 12/2013; EUROCONTROL - SIP v ATS-R2 Gateway Interworking Test Specification - Edition 2 / 12/2013; EUROCONTROL - VOTER - Edition 2.7 / 02/2014; EUROCONTROL - VOTER - Edition 2.7 / 02/2014; EUROCONTROL - VoIP in ATM Cross-Reference Matrix - Edition 2 / 12/2013; EUROCONTROL - VoIP in ATM Cross-Reference Matrix - Edition 2 / 12/2013 EUROCONTROL - VoIP in ATM Telephony Test case specification - Edition 2 / 12/2013. EUROCONTROL - VoIP in ATM Telephony Test case specification - Edition 2 / 12/2013
8
ESSIP Plan 2014 / Objective COM118 ESSIP Report 2013 Majority of States have an implementation plan. Five States consider the objective not mature enough to start planning the implementation; 35 States have reported the objective ‘Planned’, while one State has reported it as Late. Five States (DE, DK, HR, LU and NO) have reported ‘No Plan’ for the time being; The progress compared with the last cycle is as follows: Two States (HR & NO) have changed the status from Planned to No Plan. MAS, MD, MT & TR have postponed the planninng for completion by one year and AM, IE & MK by two years.
9
ESSIP Plan 2014 / Objective COM119 Objective Coordinator’s Analysis, recommendations, tips & tricks Early implementation Allows to get the benefit of the IP infrastructure, and to get early return on investment Increases Airspace flexibility within functional airspace blocks in a multi-vendor operational setting. Facilitates business continuity as Telecom service providers are phasing out their legacy analogue, 64kBit/s based and later 2MBit/s based services.
10
ESSIP Plan 2014 / Objective COM1110 Conclusions VoIP in ATM is a mature standard referenced by ICAO; VoIP in ATM is ready to be deployed over the IP infrastructure (PENS and ANSPs IP networks); VoIP in ATM will increase Airspace flexibility; VoIP in ATM will support and facilitate business continuity.
11
ESSIP Plan 2014 / Objective COM1111 Links and contacts Objective Coordinator: Adriatik Kokona, +32 2 729 3556 adriatik.kokona@eurocontrol.int DNM Objective Expert(s): L. POPESCU, +32 2 729 3757 liviu.popescu@eurocontrol.int
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.